Skip to main content

Romanian roads for STRABAG

Austrian contractor STRABAG will build a 24km stretch of highway in Romania in a deal worth €166 million.
February 28, 2012 Read time: 1 min
Austrian contractor 945 Strabag will build a 24km stretch of highway in Romania in a deal worth €166 million. The highway will feature two lanes of traffic in either direction as well as hard shoulders and will take 22 months to complete.

The deal is the follow-up lot to the highway section STRABAG is building between Deva and Orãºtie. This earlier package was awarded in November 2010. The highway running from Orãºtie and Sibiu forms part of the Pan-European Corridor 4 from the Romanian-Hungarian border at Nãdlac and running through capital Bucharest to Constanta on the Black Sea.

The order is being financed 85 % by European funds (European Funds POS-T) and by funds from the Romanian national budget. The client for the work is the Compania Nationala de Autostrazi si Drumuri Nationale din Romania. The deal is the latest in a series of orders STRABAG has won in Romania. The company generated over 60 % of its output volume in transportation infrastructures in Romania during 2010. Besides the A1, the firm is also working on national roads DN 14 and 15a, DN 19 and DN 67B with an order value of some €450 million.

For more information on companies in this article

Related Content

  • Transylvania Motorway: route to prosperity
    July 4, 2012
    Work is progressing apace on the biggest infrastructure project in Europe, the Transylvania Motorway or Autostrada Transilvania (A3) in Romania, with completion scheduled for 2013. The four-lane, 415km motorway, stretching northwest from Brasov in central Romania, at an altitude of nearly 600m, will reach the country's northwestern border with Hungary at Oradea in Câmpia Crisanei at 130m above sea level, and will connect the cities of Brasov, Fagaras, Sighisoara, Târgu Mures, Cluj-Napoca, Zalau and Oradea.
  • STRABAG building two more Polish routes
    January 12, 2018
    Contractor STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as
  • Bridge milestones for Transylvania in Romania
    July 21, 2025
    The Transylvania Bridge - Romania’s longest cable-stayed bridge - and the Buzău River Bridge - the country’s longest bridge - were recently completed.
  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports