Skip to main content

Romanian road development continues

The Romanian road authorities are trying hard to get the country's network improvement plans back on track.
February 28, 2012 Read time: 1 min
The Romanian road authorities are trying hard to get the country's network improvement plans back on track. The National Roads and Highways Company (2870 CNADNR) has recently signed a further five new contracts for the construction of highway segments. These will form part of the Pan-European Corridor IV and the total value of the deals is close to €693 million, including VAT. A consortium formed by Spedition UMB-Tehnostrade-Carena Impresa di Costruzioni was awarded a contract worth nearly €64 million to build a 10km segment of the Timisoara-Lugoj highway. Romstrade-2753 Monte Adriano Engenharia e Construcao-Donep Construct consortium won a contract worth €116 million to build a segment of the Nadlac-Arad highway. Another segment of this highway measuring 16.6km will be built by Austrian contractor Alpine Bau for €124.5 million. A consortium formed by Tirrena Scavi-Societa Italiana per Condotte d'Acqua-Cossi Construzioni will build the first segment of the Lugoj-Deva highway for €206 million. And Italian firm 3149 Impregilo was awarded a contract worth €183 million contract to build a segment of the Orastie-Sibiu highway.

For more information on companies in this article

Related Content

  • Contractor bankruptcy delays Romanian road project
    July 26, 2013
    The recent bankruptcy of the Austrian contractor Alpine Bau has affected a number of key projects across Europe in countries including Norway, Poland and now Romania. Following Alpine Bau’s bankruptcy, Romania’s national roads authority, CNADNR, cancelled the Austrian contractor’s contract to build a section of highway from Nadlac-Arad. So far, Alpine Bau has been paid €69.5 million to build a 16.6km section of the highway and around 85% of the work has been completed. It is not clear at this stage how the
  • Contract for Romanian highway construction signed
    May 10, 2012
    In Romania the road authorities have signed a deal for the construction of a 22km stretch of highway in a contract worth €91 million. The Portuguese contractor Monte Adriano will construct the section linking Nadlac with Pecica. Romania has pledged to improve and expand its highway network with the construction of new links, and much of the funding for its highway plans has been provided by the European Bank for Reconstruction and Development and the European Investment Bank (EIB).
  • Italy’s Paniga Tunnel project on track
    November 18, 2016
    Construction work is proceeding on track for the Paniga Tunnel project in Italy, with the primary drilling and blasting phase now having been completed. Located in Morbegno in northern Lombardy, the tunnel forms part of a bypass stretch for state road 38. Work on the project started in 2015 and is being carried out by Cossi Costruzioni, a subsidiary of Italian civil engineering company Societa Italiana per Condotte d'Acqua (Condotte). The client for the project is ANAS, the Italian state-controlled road com
  • Romanian roads for STRABAG
    February 28, 2012
    Austrian contractor STRABAG will build a 24km stretch of highway in Romania in a deal worth €166 million.