Skip to main content

Romania set to start Sebes-Turda motorwa construction

Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges. Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania. Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the European Union as grants and the central gover
November 7, 2014 Read time: 2 mins
Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges.

Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania.

Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the 1116 European Union as grants and the central government investing the remaining 15%.

Cecan said the motorway will be completed by March 2016 and run north from Sebes, with a population of around 25,000, to Turda with a population of 45,000.

Sebes is at the crossroads of two main highways in Romania: E68 European route - DN1 coming from Sibiu and going towards Deva and E81 European route - DN7 coming from Sibiu and going towards Alba-Iulia and Cluj.

Construction work on the motorway is split into four contracts, awarded last year.

Lot 1 – 17km from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului – was awarded to the Italian consortium 7809 Salini Impregilo at a cost of nearly $151 million (539,488,704 lei).

Lot 2, around 24km from Paraul Iovului to Aiud, was awarded to an Italian-Romanian consortium that includes RCM Costruzioni, Shelter Construct and Eurocerad International for nearly $128.5 million (460,019,270 lei).

The 12.5km Lot 3 section from Aiud to the Decea interchange is being built by the consortium of Tirrena Scavi and Societa Italiana per Condotte d'Acqua at a cost of cost of $117.5 million (420,511,921 lei).

Lot 4, around 16km from the Decea interchange to the interchange with the A3 motorway near Turda, was awarded to the Romanian division of 3976 Porr Group, Porr Construct SRL, German division Porr Bau, for a cost of $131.4 million (470,004,894 lei).

For more information on companies in this article

Related Content

  • Delay for Tvrdosin-Nizna R3 section in Slovakia
    June 22, 2023
    The NDS agency has not reported by how much the contracted cost of €62 million will rise.
  • Strabag thinks positive despite drop in half year group revenue
    September 2, 2016
    Publicly listed construction company Strabag reports “a very positive development” in the first six months of 2016, despite lower group revenue. Consolidated group revenue fell back 8% to €5,312.15 million.
  • Vinci wins stalled Strasbourg Grand Contournement Ouest deal
    November 12, 2015
    French construction group Vinci has been named preferred bidder for construction and operation of the previously canceled western motorway bypass in Strasbourg, northeastern France. Vinci will lead a consortium for the project estimated to need €475 million. The contract will be signed next year with construction to start in 2017, according to a report in the French newspaper Dernieres Nouvelles d’Alsace
  • Mirbud awarded ring road contract for Olesno, Poland
    April 4, 2019
    Mirbud has been awarded a €155 million contract to build a 25km ring road around the Polish town of Olesno. The ring-road will be part of a new S11 expressway. Other companies which competed for the contract include Strabag, Budimex, Porr and Polaqua. Olesno, with a population of around 10,000, lies about 40km from the city of Opole in southwestern Poland.