Skip to main content

Romania set to start Sebes-Turda motorwa construction

Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges. Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania. Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the European Union as grants and the central gover
November 7, 2014 Read time: 2 mins
Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges.

Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania.

Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the 1116 European Union as grants and the central government investing the remaining 15%.

Cecan said the motorway will be completed by March 2016 and run north from Sebes, with a population of around 25,000, to Turda with a population of 45,000.

Sebes is at the crossroads of two main highways in Romania: E68 European route - DN1 coming from Sibiu and going towards Deva and E81 European route - DN7 coming from Sibiu and going towards Alba-Iulia and Cluj.

Construction work on the motorway is split into four contracts, awarded last year.

Lot 1 – 17km from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului – was awarded to the Italian consortium 7809 Salini Impregilo at a cost of nearly $151 million (539,488,704 lei).

Lot 2, around 24km from Paraul Iovului to Aiud, was awarded to an Italian-Romanian consortium that includes RCM Costruzioni, Shelter Construct and Eurocerad International for nearly $128.5 million (460,019,270 lei).

The 12.5km Lot 3 section from Aiud to the Decea interchange is being built by the consortium of Tirrena Scavi and Societa Italiana per Condotte d'Acqua at a cost of cost of $117.5 million (420,511,921 lei).

Lot 4, around 16km from the Decea interchange to the interchange with the A3 motorway near Turda, was awarded to the Romanian division of 3976 Porr Group, Porr Construct SRL, German division Porr Bau, for a cost of $131.4 million (470,004,894 lei).

For more information on companies in this article

Related Content

  • New Slovakia highway opening for traffic
    November 26, 2015
    Stretches of a major new highway project in Slovakia are opening for traffic. Two sections of the D1 highway are opening by the end of 2015. Slovakian National Motorway Company has said that the second section of the 9.5km D1 highway stretch from Janovce-Jablonov, near the town of Levoca, will open by the end of 2015. The other section set to open will be the D1 stretch from Fricovce – Svinia and located near Presov. During 2015 NDS planned to open five new motorway stretches, of which three are already in
  • Contacts awarded for new UAE road links
    October 8, 2013
    Contracts for two major road projects in the United Arab Emirates (UAE) worth a combined US$2.01 billion (AED 7.40 billion) have been awarded. The contracts have been granted to Al Jaber Transport and General Contracting, Ghantoot Transport and General Contracting, Al Geemi & Partners Contracting Company, Bin Hafeez General Contracting Establishment, Delma Engineering, Larsen and Toubro, Abu Dhabi Salini Construction and Tristar for Engineering. One of the road projects will connect Dubai with Abu Dhabi,
  • Mota Engil to upgrade Paraguay’s Transchaco
    June 15, 2016
    Portuguese engineering and infrastrucure firm Mota-Engil and the Paraguayan company Concret Mix were the soul bidders for a turn-key contract to repair and upgrade Paraguay’s Route 9 Transchaco. The national highway project, costing nearly US$500 million covers around 530km. The Transchaco starts in Asunción – Paraguay’s capital and largest city - and ends at the border with Bolivia, traversing 835km. Work includes widening by a metre the 6m-wide highway that crosses the semi-arid Paraguayan Chaco, on
  • Second bascule bridge for Lowestoft
    December 10, 2020
    Total cost of the North Sea coastal project is around €160 million.