Skip to main content

Romania set to start Sebes-Turda motorwa construction

Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges. Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania. Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the European Union as grants and the central gover
November 7, 2014 Read time: 2 mins
Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges.

Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania.

Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the 1116 European Union as grants and the central government investing the remaining 15%.

Cecan said the motorway will be completed by March 2016 and run north from Sebes, with a population of around 25,000, to Turda with a population of 45,000.

Sebes is at the crossroads of two main highways in Romania: E68 European route - DN1 coming from Sibiu and going towards Deva and E81 European route - DN7 coming from Sibiu and going towards Alba-Iulia and Cluj.

Construction work on the motorway is split into four contracts, awarded last year.

Lot 1 – 17km from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului – was awarded to the Italian consortium 7809 Salini Impregilo at a cost of nearly $151 million (539,488,704 lei).

Lot 2, around 24km from Paraul Iovului to Aiud, was awarded to an Italian-Romanian consortium that includes RCM Costruzioni, Shelter Construct and Eurocerad International for nearly $128.5 million (460,019,270 lei).

The 12.5km Lot 3 section from Aiud to the Decea interchange is being built by the consortium of Tirrena Scavi and Societa Italiana per Condotte d'Acqua at a cost of cost of $117.5 million (420,511,921 lei).

Lot 4, around 16km from the Decea interchange to the interchange with the A3 motorway near Turda, was awarded to the Romanian division of 3976 Porr Group, Porr Construct SRL, German division Porr Bau, for a cost of $131.4 million (470,004,894 lei).

For more information on companies in this article

Related Content

  • Salini Impregilo shortlisted for Rozelle Interchange and Iron Cove
    May 23, 2018
    A Salini Impregilo consortium has been shortlisted to design and build the Rozelle Interchange and Iron Cove Link as part of Sydney’s WestConnex project. WestConnex, the biggest road development in Australia, is likely to cost around US$12.6 billion. At an estimated value of about $2.65 billion, the Rozelle Interchange and Iron Cove Link was commissioned by the New South Wales state government. It will include an underground motorway interchange to City West Link and underground bypass of Victoria Roa
  • Duha and Salini Impregilo to build Slovakia D1 motorway stretch
    April 23, 2014
    Slovak national motorway company NDS has chosen the consortium consisting of fellow Slovak construction company Duha and Salini Impregilo of Italy as the winner of the public procurement tender to build a 13km stretch of the D1 motorway. The Lietavska Lucka-Visnove-Dubna Skala stretch of Slovakia’s D1 includes the 7.5km long Visnove tunnel and is a tender worth nearly €410 million. It is expected that Skanska and Doprastav, which were excluded from the competition, will appeal against NDS' tender award dec
  • Salini Impregilo expands in the US with purchase of Lane Industries
    November 12, 2015
    Italian global infrastructure group Salini Impregilo has agreed to buy 100% of Lane Industries, an American highways contractor and the “top private asphalt producer” in the US. Lane, a family-owned business based in Cheshire, Connecticut, was bought for US$406 million and has a turnover of around $1.5 billion. The company has three divisions: asphalt production, road projects and other infrastructure projects, in domestic and international markets. A statement from Salini said Lane is participating i
  • EC approves €246 million for Targu Mures-Campia Turzii motorway
    June 22, 2018
    The European Commission has approved €246 million towards construction of Romania’s Targu Mures-Campia Turzii section of the A 3motorway. The EC money for the 51km four-lane section is from the EC’s Cohesion Fund, according to a report by the Romania Journal. Bechtel was originally going to build most of the 603km A3 to connect Bucharest with the Transylvania region and the north-west part of the country. Work should have started by now but contractual issues with Bechtel hampered progress.