Skip to main content

Romania set to start Sebes-Turda motorwa construction

Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges. Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania. Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the European Union as grants and the central gover
November 7, 2014 Read time: 2 mins
Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges.

Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania.

Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the 1116 European Union as grants and the central government investing the remaining 15%.

Cecan said the motorway will be completed by March 2016 and run north from Sebes, with a population of around 25,000, to Turda with a population of 45,000.

Sebes is at the crossroads of two main highways in Romania: E68 European route - DN1 coming from Sibiu and going towards Deva and E81 European route - DN7 coming from Sibiu and going towards Alba-Iulia and Cluj.

Construction work on the motorway is split into four contracts, awarded last year.

Lot 1 – 17km from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului – was awarded to the Italian consortium 7809 Salini Impregilo at a cost of nearly $151 million (539,488,704 lei).

Lot 2, around 24km from Paraul Iovului to Aiud, was awarded to an Italian-Romanian consortium that includes RCM Costruzioni, Shelter Construct and Eurocerad International for nearly $128.5 million (460,019,270 lei).

The 12.5km Lot 3 section from Aiud to the Decea interchange is being built by the consortium of Tirrena Scavi and Societa Italiana per Condotte d'Acqua at a cost of cost of $117.5 million (420,511,921 lei).

Lot 4, around 16km from the Decea interchange to the interchange with the A3 motorway near Turda, was awarded to the Romanian division of 3976 Porr Group, Porr Construct SRL, German division Porr Bau, for a cost of $131.4 million (470,004,894 lei).

For more information on companies in this article

Related Content

  • High Struma motorway tender interest
    May 11, 2012
    The tender to construct of the Struma motorway in Bulgaria has attracted interest from several international companies. The near US$130million EU funded project, which will link the Bulgarian capital Sofia with the Greek border, is expected to be completed within 27 months of the day a successful bidder is announced. Among companies interested in the project are Greek firms Aktor, GEK Terna and J&P Avax; Spanish firm FCC Construction; Bulgarian company SK 13 Patstroy; Strabag of Austria; and the Italian fi
  • Italy’s Paniga Tunnel project on track
    November 18, 2016
    Construction work is proceeding on track for the Paniga Tunnel project in Italy, with the primary drilling and blasting phase now having been completed. Located in Morbegno in northern Lombardy, the tunnel forms part of a bypass stretch for state road 38. Work on the project started in 2015 and is being carried out by Cossi Costruzioni, a subsidiary of Italian civil engineering company Societa Italiana per Condotte d'Acqua (Condotte). The client for the project is ANAS, the Italian state-controlled road com
  • Romania retenders Lugoj-Deva section of A1
    April 20, 2022
    The Lugoj-Deva segment has been troublesome, with landslides halting work at least twice.
  • Romanian roads for STRABAG
    February 28, 2012
    Austrian contractor STRABAG will build a 24km stretch of highway in Romania in a deal worth €166 million.