Skip to main content

Romania: more A3 soon to open

Around 160km of the A3 are now open.
By David Arminas October 28, 2020 Read time: 1 min
Work continues along Romania’s motorway network (photo courtesy CNADNR, Romania’s national highways agency)

Romania will complete the 6.3km Rasnov-Cristian section of the A3 motorway by the end of the year, according to the government.

The A3 motorway, when finished, will run nearly 600km from the capital Bucharest to the Transylvania region and the northwest part of the country. It will take in the towns and cities of Ploiești, Brașov, Făgăraș, Sighișoara, Târgu Mureș, Cluj-Napoca, Zalău and Oradea. At the border it will connect with Hungary's M4 motorway near Borș.

Around 160km are open, including the 62km Bucharest-Ploiești motorway segment.

Other sections under construction are the 16km Cheţani-Câmpia Turzii segment and the 4.5km Târgu Mureş-Ungheni segment.

The government plans to invest around €33 billion into thie national road network between 2021-2027, noted national media outlets.

Related Content

  • €600 million for Romania-Moldova motorway
    April 18, 2024
    A €600 million funding package for Romania-Moldova motorway.
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • Transylvanian motorway breaks new ground in engineering
    July 11, 2012
    Normally in hilly ground, we would use the excavated soil from the cuttings to fill the valleys," says Bogdan Sgarcitu, External Affairs Manager of construction company Bechtel. "But on this stretch the clay-like soil cannot be compacted, so we've had to use many more piles than normal: in just three months we installed more than 500, some drilled as deep as 24m. We've also had to transport millions of tonnes of materials over some less-than-perfect infrastructure."
  • Lázár defends Mohács Danube bridge
    January 21, 2025
    A public tender was won last year by Duna Aszfalt and the design for the controversial 750m-long three-arch structure in Hungary has been done by Hungarian civil engineering firm SpecialTerv.