Skip to main content

Road tender process opening in Israel

The Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion.
April 24, 2012 Read time: 2 mins
The 2602 Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion. This will allow the road to boost capacity and cope with the steadily increasing traffic volumes and help cut congestion on the route. Meanwhile the upgraded link will allow speeds of up to 100km/h between Ashdod interchange and Holot interchange. The newly widened route is expected to be open to traffic within 18 months. This tender is one of a series of actions implemented by 2572 Israel's Ministry of Transport with the goal of improving access to Ashdod Port. The 16km long road section that will be upgraded currently suffers from heavy traffic congestion. The new project will remove a bottleneck on one of the most congested links between Ashdod and Rishon LeZion, and the traffic in the direction of Tel Aviv. As part of the project, the bridges along the route will also be renovated. In order to shorten the time needed to carry out the project, the tenders were published based on the Price and Time (A+B) method. According to this method, the winning contractor is the bidder who offers the lowest price combined with the shortest execution time. The project is estimated to cost some US$78.7 million and is expected to be completed in less than a year.

For more information on companies in this article

Related Content

  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • UK M6 motorway project complete
    December 20, 2024
    Work for the UK’s M6 motorway upgrade project is complete.
  • Highway project in Texas required demolition equipment
    May 1, 2018
    A contractor in Texas has used equipment from Brokk to help out with a tricky highway project. Upgrading work has been carried out on a 6.4km-long stretch of I-35 in San Antonio between Loop 410 NE and Loop 410 S. This stretch of the route was carrying around 185,000 vehicles/day and was suffering increasing levels of congestion at peak periods. Travel times lengthened by 65% during rush hour, while ramps on opposite sides of the interstate caused additional congestion and safety issues. In one section, t
  • Russia seeks outside investment in road building
    November 6, 2012
    The Russian road building industry is on the verge of big changes as it bids to improve quality and speed of construction says Eugene Gerden The Russian road building industry is on the verge of big changes as the national government considers creating conditions to attract foreign companies to build roads in the country. According to a recent order of President Vladimir Putin, due to poor quality and high cost of road construction, there is a need for the development of a mechanism to attract foreign compa