Skip to main content

Road tender process opening in Israel

The Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion.
April 24, 2012 Read time: 2 mins
The 2602 Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion. This will allow the road to boost capacity and cope with the steadily increasing traffic volumes and help cut congestion on the route. Meanwhile the upgraded link will allow speeds of up to 100km/h between Ashdod interchange and Holot interchange. The newly widened route is expected to be open to traffic within 18 months. This tender is one of a series of actions implemented by 2572 Israel's Ministry of Transport with the goal of improving access to Ashdod Port. The 16km long road section that will be upgraded currently suffers from heavy traffic congestion. The new project will remove a bottleneck on one of the most congested links between Ashdod and Rishon LeZion, and the traffic in the direction of Tel Aviv. As part of the project, the bridges along the route will also be renovated. In order to shorten the time needed to carry out the project, the tenders were published based on the Price and Time (A+B) method. According to this method, the winning contractor is the bidder who offers the lowest price combined with the shortest execution time. The project is estimated to cost some US$78.7 million and is expected to be completed in less than a year.

For more information on companies in this article

Related Content

  • EastLink tollway a winner at the 9th ITS Australia National Awards
    June 4, 2019
    The Freeway Tunnel Ventilation On-Demand System for Melbourne’s EastLink project picked up the top Industry Award category at the recent 9th ITS Australia National Awards Traditional tunnel ventilation systems are inefficient. Fans operate at fixed speed in manual mode or with individual fans programmed to switch on and off at preset times to ensure zero portal emissions with all emissions dispersed via ventilation stacks. EastLink’s new ventilation on demand – VoD - system matches variable speed fan
  • Kenya highway tender process underway
    June 8, 2018
    The tendering process for a key stretch of highway is underway in Kenya at present, attracting strong interest. The US$246.5 million project is the second phase of the upgrade for the Dongo Kundu bypass, with the work expected to take 36 months to complete and construction scheduled to commence in August 2018. The first phase of the project has been carried out by the Chinese contractor CCECC. The route is being improved to dual carriageway status, with two lanes in either direction, which will boost its
  • Florida contract for Webuild’s US subsidiary
    January 17, 2023
    A key Florida contract has been awarded to Webuild’s US subsidiary, Lane Construction.
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.