Skip to main content

Road repairs will revamp the ring road around St Petersburg

Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.
April 19, 2012 Read time: 1 min
Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.

Related Content

  • $11.5 billion for Arizona transport programme
    July 8, 2025
    Arizona’s transport construction programme will be worth $11.5 billion.
  • Uganda’s capital Kampala needs road repairs
    March 8, 2021
    Uganda’s capital Kampala needs to repair its road network.
  • Smarter paving for Berlin ring road
    December 13, 2018
    Germany’s capital Berlin is now benefiting from a newly widened ring road, which will help reduce peak time congestion Much of the work has been carried out by local contractor Johann Bunte Bauunternehmung, which has helped to widen the Berlin ring road from six to eight lanes. The firm has made extensive use of sophisticated paving controls also on its Vögele machines, the AutoSet Plus automatic functions. And the firm claims that these tools have made the work easier for the paving team to move between t
  • Russian road revamp
    April 26, 2012
    Rebuilding work on Moscow’s Warshavsoye Shosse highway is due to commence shortly. The work looks set to be carried out by the ARKS Group, although final details of the contract have yet to be agreed. The work is expected to cost in the order of US$381 million to carry out. Work will include building a section of elevated road, a tunnel, seven pedestrian underpasses, and a two-level interchange. The project is due for completion by 2013.