Skip to main content

Road repairs will revamp the ring road around St Petersburg

Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.
April 19, 2012 Read time: 1 min
Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.

Related Content

  • Hanoi highway upgrade underway
    October 11, 2016
    Upgrade work is now underway for Hanoi’s Ring Road 3 project. The work is expected to cost US$138.3 million. The planned road improvement works are being carried out along a 5.5km section of the route, widening the highway to six lanes and installing five pedestrian bridges. The aim of the work is to cut congestion as the existing stretch of road experiences long traffic delays at peak periods.
  • EBRD funding for St Petersburg project?
    April 27, 2012
    The European Bank for Reconstruction and Development (EBRD) intends to provide a US$277 million (€200 million) loan to the Northern Capital Highway consortium, which will build the central 11.5km section of St Petersburg’s Western High Speed Diameter (WHSD) route. The EBRD’s board of directors has said will consider the loan on 14th February 2012. The finance package is of note as Russian road projects have largely found funds from other sources so far. The Northern Capital Highway consortium estimates the
  • New highway investment for Moscow
    September 16, 2014
    A series of highway projects are either underway or being planned in Russian capital Moscow. Russian road authority Avtodor is inviting bids for construction and maintenance of the Central Ring Road's fifth start-up facility in the Moscow region. The road section will be 76km long and the concession package will be for 24 years. The maximum price of the contract has been set at US$1.14 billion. Is also opening bids for construction of the M11 Moscow-St Petersburg motorway's 208-258 km section. The project w
  • Crucial Russian road
    March 1, 2012
    Preparation work is due to start on the new six-lane highway between St Petersburg and Tosno.