Skip to main content

River Mersey second bridge?

The inquiry into plans to build a second bridge across the River Mersey is underway in the UK. When complete, the €490 million, 1km long Mersey Gateway toll crossing will link Runcorn and Widnes in County Cheshire to ease congestion on the existing Silver Jubilee Bridge. The plans for the six-lane bridge were submitted in 2008 and the crossing is expected to help create thousands of jobs. However opponents of the scheme claim that tolls planned for both bridges would cast an economic blight across the area
July 12, 2012 Read time: 1 min
The inquiry into plans to build a second bridge across the River Mersey is underway in the UK.

When complete, the €490 million, 1km long 6126 Mersey Gateway toll crossing will link Runcorn and Widnes in County Cheshire to ease congestion on the existing Silver Jubilee Bridge.

The plans for the six-lane bridge were submitted in 2008 and the crossing is expected to help create thousands of jobs. However opponents of the scheme claim that tolls planned for both bridges would cast an economic blight across the area. Under the proposals, users of the existing free-to-use bridge would also be charged tolls once the new crossing opens.

If the public inquiry gives approval for the project, construction will start in 2011 and the bridge would open in 2014.

For more information on companies in this article

Related Content

  • Washington State toll route planned
    October 4, 2022
    A new toll route is planned for Washington State.
  • Korea strategy
    February 6, 2012
    South Korea is setting an ambitious transport and infrastructure budget for 2010. The country intends to invest US$52.51 billion on projects for new roads and highways, as well as rail and port developments.
  • 'Tricky' bridge project
    February 7, 2012
    Contractor Ringway has completed work on a tricky project to replace Stile Farm Bridge, which crosses the Great Stour River near Chilham in County Kent, south-east England. Built in the 1920s, the bridge was in a severe state of disrepair resulting in weight restrictions of just 3tonnes. The new structure has a 16m span and is constructed using pre-cast concrete, with pre-stressed steel-reinforced beams based on cast in-situ abutment, and enables the bridge to carry heavier traffic. As well as helping to ea
  • Work starting on second Chesapeake Tunnel project
    September 20, 2017
    Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil