Skip to main content

Rivard’s pipe laying dream

Rivard RIV1403 TC1755 is a chainsaw trencher suitable for creating large trenches for major underground power, gas, fibre optic, water, irrigation or sewer project works.
January 6, 2017 Read time: 1 min
Rivard’s RIV1403 TC1755 chainsaw trencher, launched in July 2011, is now being aimed at wider pipe and cable installation markets
2424 Rivard RIV1403 TC1755 is a chainsaw trencher suitable for creating large trenches for major underground power, gas, fibre optic, water, irrigation or sewer project works. 
 
With a 387hp engine and weighing in at 32tonnes, the high output capacity machine can be fitted with different chains and can create a maximum trench width of 600mm and depth of 1,700mm. Debris created by the TC1755 is removed by a conveyor system.

According to Rivard, the TC1755 has been mostly used in communication and energy supply projects since its launch in July 2011. The firm is keen to showcase its potential benefits to wider customers.

%$Linker: External 0 0 0 oLinkExternal www.rivard.fr Rivard false http://www.rivard.fr/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Chrono Flex seeks additional partners for hose repair services
    January 6, 2017
    Visitors to the Chrono Flex stand can imagine themselves in either the Sahara or the frozen north. The company has set up a convivial stand, equipped with an ice bar and a Saharan tent to emphasise that even the hottest and coldest places are within reach of its emergency hydraulic hose repair services. Broken hoses can paralyse a construction site, says the company, whose network of technicians operate from mobile workshops and aim to be on site within an hour.
  • Chrono Flex seeks additional partners for hose repair services
    April 18, 2012
    Visitors to the Chrono Flex stand can imagine themselves in either the Sahara or the frozen north. The company has set up a convivial stand, equipped with an ice bar and a Saharan tent to emphasise that even the hottest and coldest places are within reach of its emergency hydraulic hose repair services. Broken hoses can paralyse a construction site, says the company, whose network of technicians operate from mobile workshops and aim to be on site within an hour.
  • Hammer time at BSP
    January 6, 2017
    BSP International Foundations (BSP) will be exhibiting its new DX hydraulic piling hammer at Intermat 2012 – the first time the product has gone on public show. The hammer has been specifically developed to drive steel piles to support electrification stanchions, gantries and other railway projects requiring foundation piling. BSP, which one of the world’s leading manufacturers of hydraulic piling and compaction equipment, will also have a pictorial display at Intermat 2012 highlighting some of the many civ
  • Hammer time at BSP
    April 13, 2012
    BSP International Foundations (BSP) will be exhibiting its new DX hydraulic piling hammer at Intermat 2012 – the first time the product has gone on public show. The hammer has been specifically developed to drive steel piles to support electrification stanchions, gantries and other railway projects requiring foundation piling. BSP, which one of the world’s leading manufacturers of hydraulic piling and compaction equipment, will also have a pictorial display at Intermat 2012 highlighting some of the many civ