Skip to main content

Ring road for Sarajevo nears completion

The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag. The completed Ring Road will be part of the future Corridor Vc motorway. Bosnia and Herzegovina Federal Minister of Transport and Telecoms, Enver Bijedic, and State Minister of Telecoms and Transport and Director of the roads company JP Ceste FBiH, Filip Vujevo, r
December 17, 2012 Read time: 1 min
The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of 5576 HP Investing and 945 Strabag. The completed Ring Road will be part of the future Corridor Vc motorway. Bosnia and Herzegovina Federal Minister of Transport and Telecoms, Enver Bijedic, and State Minister of Telecoms and Transport and Director of the roads company JP Ceste FBiH, Filip Vujevo, recently visited the Sarajevo Ring Road construction site. The project has received US$20.54million from the 1166 European Bank for Reconstruction and Development (EBRD) and the 1054 European Investment Bank (EIB).

Related Content

  • Bosnia: more funds for Corridor C5 work
    June 25, 2021
    Bosnia’s national road agency Autoceste FBiHreports reports that 92km of Corridor 5C have been completed.
  • Croatia opens 17.5km section of Corridor 5c
    December 14, 2022
    The majority of the 5c, or Vc, route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD)
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway
    October 20, 2017
    Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.