Skip to main content

RFQ is out for the Gordie Howe Bridge to link US and Canada

The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
July 22, 2015 Read time: 3 mins
Suspension option, artist impression (source: WDBA)
The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario.

The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River.

The bridge also likely will come with a hefty price tag – around US$1.62 billion, as 3260 World Highways %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal reported in May Visit &quot;New international trade crossing linking Canada and US&quot; page false http://http//www.worldhighways.com/sections/key-projects/features/new-international-trade-crossing-linking-canada-and-us/ false false%> in a feature on the proposed bridge.

In January, the Canadian arm of California-based 3220 Parsons was appointed as general engineering consultant under a reportedly $17 million contract. The eventual contract will be to design, build, finance, operate and maintain the Gordie Howe International Bridge project that include the Canadian and US ports of entry and the interchange to Interstate 75 in Michigan.

The WDBA will manage the procurement process for the design, construction, operation and maintenance of the new bridge. It is also responsible for project oversight including the actual construction and operation of the new crossing. As the operator of the new bridge, the WDBA will set and collect all tolls.

There are several types of Detroit River crossings, but the vast majority of commercial traffic must use the aging and privately owned 2.3km Ambassador Toll Bridge. The new bridge, initially proposed in 2004, will be built around 3.5km downriver form the Ambassador Bridge.

The importance of the bridge is immense to both state and provincial economies, as well national economies. Around a quarter of the annual $658 billion Canada-US trade crosses the river.
But the project will not be a joint venture between the US and Canada, mainly due to the US government’s reluctance to help finance a new crossing, despite hard lobbying by the Michigan state government. Michigan governor Rick Snyder remains a strong supporter of the bridge.

Instead, the new bridge will be a solely Canadian project, down to road connections with the Interstate highway on the US side. It also will be a public-private partnership project. Canada has shown commitment to a new bridge by going ahead with a major connecting road from Windsor. This summer should see completion of the last section of the Herb Gray Parkway that will funnel traffic off the new bridge directly onto the Highway 401 freeway. The 11km Herb Gray has will have cost £1.2 billion to construct, also under a PPP deal.

“Our overarching goal is to build a safe, efficient bridge as fast as possible. The more financial and project risk that we can transfer to the eventual winning bidder, the better this procurement will be for Canadian taxpayers,” said Mark McQueen, chairman of the WDBA board of directors

“With input from Transport Canada, the 2630 Michigan Department of Transportation, the 2410 Federal Highway Administration and other state, provincial and federal organisations, the WDBA has developed a request for qualifications designed to position us to ultimately evaluate submissions and select the most suitable private sector partner,” said Michael Cautillo, chief executive of the WDBA. “A key attribute for any successful respondent is their approach to engage regional resources and leave long-lasting benefits.”

The WBDA will hold introductory project meetings and supplier meetings in both cities in early August. The procurement process is expected to take 18 months, including a request for proposal to be issued later this year.

Related Content

  • Recycled pavement use rises again in the US, according to NAPA
    January 16, 2015
    The use of reclaimed asphalt pavement in the United States increased during 2013 after two years of no rise, according the latest report from the US National Asphalt Pavement Association (NAPA). The report found that more than 73 million tons of reclaimed asphalt pavement and 1.7 million tons of reclaimed asphalt roofing shingles were used in new asphalt pavement mixes in the United States during in 2013. Using recycled asphalt material saved about $2 billion in 2013 over the use of virgin materials,
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • Demolition of Seattle’s Alaskan Way Viaduct has started
    February 28, 2019
    Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s
  • RDIF chief Dimitriev considers Arab partners for Moscow ring road
    October 16, 2014
    Arab partners have been secured as co-investors for construction of the third and fourth phase of Moscow’s Central Ring Road, Russia’s Interfax news agency reported. Kirill Dmitriev, head of the Russian Direct Investment Fund (RDIF), made the announcement earlier this month during a meeting of the State Council's presidium in Novosibirsk, chaired by president Vladimir Putin. Dmitriev did not name the Arab partners but said they “have confirmed their desire” to invest in the third and fourth phases.