Skip to main content

RFQ is out for the Gordie Howe Bridge to link US and Canada

The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
July 22, 2015 Read time: 3 mins
Suspension option, artist impression (source: WDBA)
The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario.

The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River.

The bridge also likely will come with a hefty price tag – around US$1.62 billion, as 3260 World Highways %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal reported in May Visit &quot;New international trade crossing linking Canada and US&quot; page false http://http//www.worldhighways.com/sections/key-projects/features/new-international-trade-crossing-linking-canada-and-us/ false false%> in a feature on the proposed bridge.

In January, the Canadian arm of California-based 3220 Parsons was appointed as general engineering consultant under a reportedly $17 million contract. The eventual contract will be to design, build, finance, operate and maintain the Gordie Howe International Bridge project that include the Canadian and US ports of entry and the interchange to Interstate 75 in Michigan.

The WDBA will manage the procurement process for the design, construction, operation and maintenance of the new bridge. It is also responsible for project oversight including the actual construction and operation of the new crossing. As the operator of the new bridge, the WDBA will set and collect all tolls.

There are several types of Detroit River crossings, but the vast majority of commercial traffic must use the aging and privately owned 2.3km Ambassador Toll Bridge. The new bridge, initially proposed in 2004, will be built around 3.5km downriver form the Ambassador Bridge.

The importance of the bridge is immense to both state and provincial economies, as well national economies. Around a quarter of the annual $658 billion Canada-US trade crosses the river.
But the project will not be a joint venture between the US and Canada, mainly due to the US government’s reluctance to help finance a new crossing, despite hard lobbying by the Michigan state government. Michigan governor Rick Snyder remains a strong supporter of the bridge.

Instead, the new bridge will be a solely Canadian project, down to road connections with the Interstate highway on the US side. It also will be a public-private partnership project. Canada has shown commitment to a new bridge by going ahead with a major connecting road from Windsor. This summer should see completion of the last section of the Herb Gray Parkway that will funnel traffic off the new bridge directly onto the Highway 401 freeway. The 11km Herb Gray has will have cost £1.2 billion to construct, also under a PPP deal.

“Our overarching goal is to build a safe, efficient bridge as fast as possible. The more financial and project risk that we can transfer to the eventual winning bidder, the better this procurement will be for Canadian taxpayers,” said Mark McQueen, chairman of the WDBA board of directors

“With input from Transport Canada, the 2630 Michigan Department of Transportation, the 2410 Federal Highway Administration and other state, provincial and federal organisations, the WDBA has developed a request for qualifications designed to position us to ultimately evaluate submissions and select the most suitable private sector partner,” said Michael Cautillo, chief executive of the WDBA. “A key attribute for any successful respondent is their approach to engage regional resources and leave long-lasting benefits.”

The WBDA will hold introductory project meetings and supplier meetings in both cities in early August. The procurement process is expected to take 18 months, including a request for proposal to be issued later this year.

Related Content

  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.
  • World Highways contributor Max Lay wins Peter Nicol Russell award
    December 9, 2014
    The Institution of Engineers Australia has awarded World Highways contributor Dr Maxwell Lay the prestigious Peter Nicol Russell medal for his contribution to science and engineering. According to the citation, the medal is the most prestigious award made by the institution. “The recipient represents the technical, professional and community service standards of engineering to the profession and the community.” May received degrees at Melbourne University and the US university Lehigh in Pennsylvania.
  • Seoul, city of contemplation and the 25th World Road Congress
    March 18, 2015
    It’s been a decade since South Korea’s capital city Seoul took the bold step of replacing a major urban throughway with a park, complete with a river, to create the Cheonggyecheon Walkway. Now, Seoul is getting ready to host the 25th World Road Congress from November 2-5. The event is being produced in cooperation with the Ministry of Land, Infrastructure and Transport of the Republic of Korea, the Korea Expressway Corporation, the Korea Road & Transportation Association and the PIARC Korean National Commit
  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack