Skip to main content

Renfrew Bridge opening tests complete

The 184m-long cable-stay bridge near Glasgow, Scotland, will be the first road bridge across the River Clyde to open for passing ships.
By David Arminas August 28, 2024 Read time: 2 mins
The cable stay system is similar to Scotland’s Queensferry Crossing bridge - a twin-leaf design with each leaf opening and closing horizontally (image courtesy Graham Construction)

The first operational working of the Renfrew Bridge near Glasgow, Scotland has been accomplished ahead of the bridge opening by the end of this year.

Main contractor Graham said it will continue commissioning works for the bridge that will be the first road bridge across the River Clyde to open for passing ships. The 184m-long cable-stay two-lane road bridge will carry vehicles, pedestrians and cyclists between Glasgow and West Dunbartonshire.

The cable stay system is similar to the Queensferry Crossing - a twin-leaf design with each leaf opening and closing horizontally. Most commercial ships travel on the river during high tide, which happens once during the day and once during the night. When this happens, the bridge will be closed to road traffic, with signs nearby and information online providing advance notice of any closure to all people to plan ahead.

There will be new walking and cycling routes alongside all new roads through Renfrew and across the bridge.

The bridge is central to the major Clyde Waterfront and Renfrew Riverside redevelopment. “It was great to see the bridge closing for the first time in such a smooth, controlled and seamless operation,” said Jim Armour, project director at Graham, a privately-owned national construction company with a €1.32 billion turnover.

The two sections of the bridge were manufactured in the Netherlands and barged over, passing up the English Channel and then up the Irish sea to the site earlier this year.

The project is jointly funded by the UK and Scottish governments through the €1.32 billion Glasgow City Region, a partnership of eight councils working together.

For more information on companies in this article

Related Content

  • Work starts on Széchenyi Chain Bridge
    June 29, 2021
    A-Hid has begun improvements to Budapest’s Széchenyi Chain Bridge - in Hungarian the Széchenyi Lánchíd - a suspension bridge connecting Buda and Pest across the Danube.
  • New Norwegian bridge open to traffic
    December 11, 2018
    A new bridge is now open to traffic in Norway. The Hålogaland Bridge has a total length of 1,533m and a main span of 1,145m and is Norway's second longest suspension bridge. The structure was designed by COWI and crosses the deep waters of Rombaksfjorden in northern Norway. The bridge will improve road safety, as well as reducing the distance between Narvik and Bjerkvik by 18km. The pre-existing route around Rombaksfjorden is frequently exposed to landslides and the opening of the bridge shortens travel tim
  • Key Russian road construction complete
    December 5, 2016
    Construction work on the Central Section of Russia’s Western High-Speed Diameter (WHSD) in St Petersburg is complete, with some small detail work now being finished off. The WHSD connects the Southern, Central and Northern sections of St Petersburg and will open to traffic at the end of December. VTB Capital was a key participant in funding the construction of the Central Section and is a major shareholder in the consortium that will operate the entire WHSD route.
  • Zealand to gain from Fehmarn Belt tunnel
    July 2, 2021
    The number of commuters crossing the Fehmarn Belt, a Baltic Sea strait that separates a German island and a Danish island, could reach 1.2 million by 2030, notes a new report.