Skip to main content

Relief road eases Carlisle centre

The number of Heavy Goods Vehicles travelling through Carlisle’s city centre is estimated to have been reduced by more than a third since the new multi-million euro Carlisle Northern Development Route opened in February 2012. Information from a network of 20 permanent and temporary traffic counters around the city showing ‘before and after’ CNDR road usage is said to be starting to build a more meaningful picture of the impact the new road has had on Carlisle. It shows a marked reduction in both cars and HG
December 11, 2012 Read time: 2 mins
The number of Heavy Goods Vehicles travelling through Carlisle’s city centre is estimated to have been reduced by more than a third since the new multi-million euro Carlisle Northern Development Route opened in February 2012.
Information from a network of 20 permanent and temporary traffic counters around the city showing ‘before and after’ CNDR road usage is said to be starting to build a more meaningful picture of the impact the new road has had on Carlisle.

It shows a marked reduction in both cars and HGVs along the main north to south arterial route through the city – the A7 and A595 – as an average of more than 10,000 vehicles/day use the new 8.25km road. Carlisle’s busiest stretch of road, the A595 at Castle Way, has shown a 16% reduction in all vehicles from 38,083/day before the opening of CNDR to 32,050 afterwards (with a 41% reduction in HGVs from 6,860 to 4,060). Other city centre hotspots have shown similar reductions, with the A7 at Stanwix Bank showing a 16% reduction in all vehicles and a 32% reduction in HGVs.

CNDR is said by CCC to have quickly become a key route to travel between the south west of the city and the industrial areas to the north - a big factor for employers looking to develop good communications channels in areas ripe for commercial development.

Related Content

  • The UK’s first PFI road project opens
    May 18, 2012
    A new bypass around Carlisle in North West England has opened to the public two months ahead of schedule. The Carlisle Northern Development Route (CNDR) starts from the Wigton Road (A595) to the south west of Carlisle, follows a route around the west of the city crossing the River Eden on a new bridge near Stainton and the West Coast Main Line on a new two-lane bridge constructed at Kingmoor. The road layout allows easier access to West Cumbria from the roundabout at Junction 44 of the M6 rather than havin
  • Bridge improvements reduce flood threat
    February 16, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Bridge improvements reduce flood threat
    April 4, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Hitex offers fast and reliable crack and pothole repairs for asphalt roads
    June 24, 2014
    Clearview Traffic brand Golden River’s innovative M210 Logging Stud for planners and road operators is said to be achieving global sales success among those looking for a low-cost vehicle counting solution for both permanent and occasional data collection. The M210 solar powered logging stud provides accurate count information in a simple self-contained unit that can be installed quickly and easily, thus minimising costs, saving valuable time and most importantly disruption with installation and ongoing