Skip to main content

Rain storms destroy Beijing’s road surfaces

As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority. Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.
August 17, 2012 Read time: 2 mins
As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority.

Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.

"Our hotline operators are receiving about 25 calls a day as a result of the heavy downpours,” a spokesman for the emergency information department of the group told local reporters.

A road surface on the crossing between Huajiadi Street and Wanghua Road, in Chaoyang district, caved in earlier this month leaving a two metre deep hole covering at least 10 square metres of pavement. According to the maintenance group, the collapse was caused by loosened soils that were eroded by the persistent rains as well as leaks in underground water pipes.

The Beijing Maintenance Group says that is has now deployed at least 2,561 workers to deal with collapsed pavements or waterlogged roads. "Our workers can repair small holes, of about one to two 2 square meters, within 24 hours,” said the spokesman. “But for bigger ones we need to work up a plan and think about the underground pipes for natural gas and water.”

The company has patrol teams out watching the whole city, paying special attention to lower-ground sections under bridges or on roads, he said, adding “we've also used radar vans to estimate underground conditions and help maintenance workers.”

In addition, the Beijing government also posted a message on its micro blog providing the maintenance group's hotline and asking people to call the police if they spot dangerous areas.

This will not solve the problem though, says Jiang Zhongguang, a city planning professor at the Beijing University of Civil Engineering and Architecture. He believes that the key problem behind the collapsed pavements is lack of regular maintenance.

"Workers didn't fill holes thoroughly and they often leave gaps,” he says. “And this causes soil erosion. The weather is out of our control, but other problems can be solved with regular maintenance."

Related Content

  • Think global act local: Terex expands global operations
    April 19, 2012
    Terex boss Ron DeFoe has spoken about the company’s expanded global strategy and confirmed his thoughts about the threat represented by Chinese manufacturers. “This year has started well for the Terex organisation and we are confident that our markets are moving into an extended cycle of economic growth right around the globe. As a result we are forecasting a significant growth in sales from US$6.5 billion (2011) to US$8.5 billion,” he said.
  • Bitumen provides more durable road surface
    February 7, 2012
    When the main commuter route into Cardiff, the Welsh capital, began to suffer from acute deformation, the Vale of Glamorgan Council required a durable and faster alternative to hot rolled asphalt to ensure minimum disruption for local road users.
  • Bitumen provides more durable road surface
    April 5, 2012
    When the main commuter route into Cardiff, the Welsh capital, began to suffer from acute deformation, the Vale of Glamorgan Council required a durable and faster alternative to hot rolled asphalt to ensure minimum disruption for local road users.
  • UV lining is highway drainage first for UK motorway upgrade
    December 19, 2017
    Drainage specialist Lanes Group is implementing the first project to extensively line highway drainage pipes as part of a Smart Motorway initiative in the UK. Lanes has been commissioned by the Carillion Kier Joint Venture working for Highways England to install ultra-violet – UV - liners during the M6 Junction 16-19 Smart Motorway scheme between Crewe and Knutsford, in county Cheshire. Lanes said that it is the first time that roadside drainage pipes will have been extensively lined, instead of being