Skip to main content

Rain storms destroy Beijing’s road surfaces

As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority. Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.
August 17, 2012 Read time: 2 mins
As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority.

Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.

"Our hotline operators are receiving about 25 calls a day as a result of the heavy downpours,” a spokesman for the emergency information department of the group told local reporters.

A road surface on the crossing between Huajiadi Street and Wanghua Road, in Chaoyang district, caved in earlier this month leaving a two metre deep hole covering at least 10 square metres of pavement. According to the maintenance group, the collapse was caused by loosened soils that were eroded by the persistent rains as well as leaks in underground water pipes.

The Beijing Maintenance Group says that is has now deployed at least 2,561 workers to deal with collapsed pavements or waterlogged roads. "Our workers can repair small holes, of about one to two 2 square meters, within 24 hours,” said the spokesman. “But for bigger ones we need to work up a plan and think about the underground pipes for natural gas and water.”

The company has patrol teams out watching the whole city, paying special attention to lower-ground sections under bridges or on roads, he said, adding “we've also used radar vans to estimate underground conditions and help maintenance workers.”

In addition, the Beijing government also posted a message on its micro blog providing the maintenance group's hotline and asking people to call the police if they spot dangerous areas.

This will not solve the problem though, says Jiang Zhongguang, a city planning professor at the Beijing University of Civil Engineering and Architecture. He believes that the key problem behind the collapsed pavements is lack of regular maintenance.

"Workers didn't fill holes thoroughly and they often leave gaps,” he says. “And this causes soil erosion. The weather is out of our control, but other problems can be solved with regular maintenance."

Related Content

  • Herrenknecht launches Abu Dhabi service
    February 18, 2013
    Herrenknecht says it has responded to the high demand for micro-machines and comprehensive services in the Gulf region by opening a full-service branch in Abu Dhabi. The new company, Herrenknecht Tunnelling Systems, offers top machine overhauls, field service and supply of spare parts. “The Arab market provides for enormous future potentials. This is the reason why we have now established a full-service branch for micro-machines in Abu Dhabi,” says Ulrich Schaffhauser, head of management of the business uni
  • ACO curbs the rain
    November 20, 2023

    ACO says its KerbDrain CycleKerb drainage solution for bike lanes in England meets LTN 1/20 standards while making travel safer for all cycle lane users.

    Local Transport Note 1/20 (LTN 1/20) sets out minimum standards for English local authorities and highway engineers when implementing new cycle infrastructure. It includes, but is not limited to, cycle crossings and junctions, cycle lanes, cycle tracks, cycle networks and cycle parking.

  • Electronic controls bring efficiency to Bergkamp’s micro surfacing paver
    January 6, 2017
    Bergkamp has launched the M1E self-propelled continuous slurry seal and micro surfacing paver. The machine has two main advantages over older versions, said the manufacturer: it is easier to operate and has electronic mix control and diagnostics. “It is much simpler to operate than the old-style machine,” said Bergkamp general manager Bill Cooper. “The operator can pick it up much quicker which means that if you lose an operator you can get a new one up to speed faster.”
  • Nova Scotia boosts highway spend
    February 8, 2021
    The Canadian province will focus on pavement preservation.