Skip to main content

Qatar’s Lusail tunnel project

Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel. The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tourname
March 24, 2017 Read time: 2 mins
Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system

The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. 2314 Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel.

The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tournament.

The overall Lusail City Development, located 15km north of Doha, covers a 38km2 site, which includes 25,000 residential units, housing 175,000 people, all of whom will benefit from the Lusail Tunnel project. The development will generate significant economic diversification as it is set to strengthen Qatar’s tourism sector.

The construction of this new underground infrastructure faced challenging ground conditions and fast track construction programmes due to a high water table.

Following a number of projects where un-bonded waterproofing systems had leaked on other Lusail sites, the client LREDC was keen for waterproofing technologies to set new standards.

James Hopper, regional sales manager – Middle East, Stirling Lloyd, said, “Faced with challenging ground conditions and a fast track construction programme, the ease, speed and effectiveness of the Integritank fully bonded, seamless waterproofing system was integral to the project.”

For more information on companies in this article

Related Content

  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w
  • Eliminating leaks on Prague bridge
    July 17, 2012
    Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair
  • Eliminating leaks on Prague bridge
    July 17, 2012
    Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair
  • Key highway project for Qatar
    April 3, 2014
    Design and construction work is commencing on a 47km highway project in Qatar. The design and construction portions of the US$1.17 billion project will be handled by Qatar bin Oman Trading and Contracting (Qatar bin Omran) and QDVC. The 47km highway project includes the construction of a 320m cut-and-cover tunnel, 17 bridges and underpasses as well as six viaducts. The project forms the second phase of Qatar’s 200km New Orbital Highway. The work is expected to take 36 months to complete and construction act