Skip to main content

Putzmeister adds five-section pump

Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
January 6, 2017 Read time: 2 mins
Putzmeister’s new five section pump offers an additional 3m of height
1259 Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option.

Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building.  

In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed.

The machine also benefits from Putzmeister’s weight reduction drive, which sees the gross weights brought down from the chassis’ design weight to the GVW. This ensures the machines won’t suffer from additional weight restrictions although Paul Kimberlin, CEO of Putzmeister UK, said he expects the pumps to continue being registered as construction plant.

Also updated is the Ergonic 2 remote control system, which is now 30% lighter and includes a 90mm screen, which displays full information about the machine’s setting and operation.

Stand: B6.100

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44727 0 oLinkExternal www.Putzmeister.co.uk www.Putzmeister.co.uk false /EasySiteWeb/GatewayLink.aspx?alId=44727 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Palfinger launches 30m truck-mounted platform
    January 6, 2017
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.
  • Palfinger launches 30m truck-mounted platform
    April 19, 2012
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.
  • Compi’s casting and machining dynamism
    January 6, 2017
    A modern and dynamic company founded in 1994, Compi specialises in the aluminium casting by automatic and manual gravity line, machining of components for the automotive market, the production of Shell moulding cores, and thermoforming and moulding of plastic parts. In 1999, Compi became one of the first companies in Italy to reach and maintain the Environmental Certification ISO 14001.
  • Compi’s casting and machining dynamism
    March 27, 2013
    A modern and dynamic company founded in 1994, Compi specialises in the aluminium casting by automatic and manual gravity line, machining of components for the automotive market, the production of Shell moulding cores, and thermoforming and moulding of plastic parts. In 1999, Compi became one of the first companies in Italy to reach and maintain the Environmental Certification ISO 14001.