Skip to main content

£495 million National Highways specialist contract

A £495 million National Highways specialist engineering advice contract has been awarded.
By MJ Woof July 1, 2025 Read time: 2 mins
M42: A new stretch of dual carriageway in the UK is now open and will cut journey times for drivers


A £495 million contract has been awarded by National Highways to AtkinsRéalis Jacobs Joint Venture, Ove Arup & Partners, Amey, Arcadis, Costain, and WSP in collaboration with Mott MacDonald. This for a new Specialist Professional and Technical Services Framework (SPaTS3) contract. The firms will have been selected by National Highways for the SPaTS3, technical engineering advice framework.

This advisory and engineering role is intended to help the highways network drive economic growth, improve safety and reliability, and further the UK’s decarbonisation goals. This builds on the foundations laid under the SPaTS2 framework, which Costain was previously selected for. The SPaTS3 Framework has an estimated maximum value of up to £495 million to the six suppliers over its six-year term and will cover the whole of Roads Investment Strategy 3. 

The services under the framework will encompass geotechnical engineering, asset operation, maintenance, assurance, performance, design standards manuals and departures, environmental, highways structures, sustainability, and transport engineering services.

The previous framework, SPaTS2, facilitated specialist advice and support through the Second Road Investment Strategy.

Meanwhile, a new stretch of dual carriageway in the UK will improve journey times for drivers. The A4545 dual carriageway links the newly built junction 5a on the M42 with Clock Interchange roundabout – providing people with direct access from the M42 to Birmingham Business Park, Birmingham Airport and the A45 to Birmingham, whilst also acting as an alternative route into the National Exhibition Centre.

The 2.4km stretch initially opened with one lane running in both directions at the end of last year but now permanent traffic management has been removed, and the road is fully up and running helping to relieve traffic congestion at junction 6 and poor journey reliability in the area.

With work due to complete on the M42 Junction 6 scheme this winter, National Highways has revealed that by combining works along the corridor it has been able to avoid 8,892 hours of closures, saving the taxpayer over £650,000 and preventing 1,072tonnes of carbon emissions.

So far, HS2 works, utility company work and National Highways maintenance and survey schemes have been completed during the M42 closures and project teams working in the area continue to identify opportunities to reduce disruption and save money.

For more information on companies in this article

Related Content

  • Italian highway construction project
    April 28, 2022
    A major Italian highway construction project is commencing.
  • GRAA focuses on winning project profile: Brisbane Airport Link, Northern Busway & Airport
    May 19, 2014
    The revolutionary AUD$4.8 billion Airport Link has delivered a landmark infrastructure project for Australia, tackling traffic congestion, enhancing the busway network and removing an infamous traffic bottleneck through an innovative and inspired design. The Airport Link in Brisbane, Australia included three separate projects – the Northern Busway (a 3km two-way dedicated busway), the Airport Roundabout Upgrade and the AirportlinkM7 (a 6.7km toll road including 5.2km of tunnel). Together, they represent the
  • Financial close for Louisiana’s Calcasieu Bridge
    August 19, 2024
    Sacyr said that the project is the company’s first transportation infrastructure private-public partnership contract in the US and calls for a total of $2.27 billion in construction investment.
  • Workzones benefit from new mobile speed enforcement technology
    April 10, 2012
    A variety of new technology for temporary speed zones during major highway projects across the globe is about to hit the market, while other proven systems remain in demand. Guy Woodford reports. The D-Cam P is one of four new mobile speed reading products for temporary speed zones being launched this month by Truvelo. Deployable solely as a speed camera or at a red light intersection to monitor red light offences, the D-Cam P can also act as a speed camera on the green and amber light phases. The machine d