Skip to main content

£495 million National Highways specialist contract

A £495 million National Highways specialist engineering advice contract has been awarded.
By MJ Woof July 1, 2025 Read time: 2 mins
M42: A new stretch of dual carriageway in the UK is now open and will cut journey times for drivers


A £495 million contract has been awarded by National Highways to AtkinsRéalis Jacobs Joint Venture, Ove Arup & Partners, Amey, Arcadis, Costain, and WSP in collaboration with Mott MacDonald. This for a new Specialist Professional and Technical Services Framework (SPaTS3) contract. The firms will have been selected by National Highways for the SPaTS3, technical engineering advice framework.

This advisory and engineering role is intended to help the highways network drive economic growth, improve safety and reliability, and further the UK’s decarbonisation goals. This builds on the foundations laid under the SPaTS2 framework, which Costain was previously selected for. The SPaTS3 Framework has an estimated maximum value of up to £495 million to the six suppliers over its six-year term and will cover the whole of Roads Investment Strategy 3. 

The services under the framework will encompass geotechnical engineering, asset operation, maintenance, assurance, performance, design standards manuals and departures, environmental, highways structures, sustainability, and transport engineering services.

The previous framework, SPaTS2, facilitated specialist advice and support through the Second Road Investment Strategy.

Meanwhile, a new stretch of dual carriageway in the UK will improve journey times for drivers. The A4545 dual carriageway links the newly built junction 5a on the M42 with Clock Interchange roundabout – providing people with direct access from the M42 to Birmingham Business Park, Birmingham Airport and the A45 to Birmingham, whilst also acting as an alternative route into the National Exhibition Centre.

The 2.4km stretch initially opened with one lane running in both directions at the end of last year but now permanent traffic management has been removed, and the road is fully up and running helping to relieve traffic congestion at junction 6 and poor journey reliability in the area.

With work due to complete on the M42 Junction 6 scheme this winter, National Highways has revealed that by combining works along the corridor it has been able to avoid 8,892 hours of closures, saving the taxpayer over £650,000 and preventing 1,072tonnes of carbon emissions.

So far, HS2 works, utility company work and National Highways maintenance and survey schemes have been completed during the M42 closures and project teams working in the area continue to identify opportunities to reduce disruption and save money.

For more information on companies in this article

Related Content

  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.
  • Upgrade work starts on junction of London’s orbital motorway M25
    February 20, 2015
    Work has started on a €136 million road improvement project on the UK’s London ring road, the M25 motorway. Crews from Balfour Beatty and Skanska have moved onto the interchange between the A13 national road and the M25 at junction 30 near Thurrock in the county Essex. The A13 on approach to the junction will be widened to four lanes in each direction and the junction itself will have dedicated link roads between the M25 and the A13. “Traffic at the junction is expected to grow by up to a quarter b
  • Road safety improvement across Europe
    June 18, 2021
    Road safety improvements vary across Europe.
  • Boost to infrastructure, autonomous cars in UK budget
    March 17, 2016
    The UK chancellor announced in his spring budget what he called the biggest investment, US$87.5 billion (£61 billion), in transport infrastructure in generations and is increasing capital investment in the transport network by 50 per cent over this Parliament compared to the last. The government plans to establish the UK as a global centre for excellence in connected and autonomous vehicles by establishing a US$24.1 million (£15 million) ‘connected corridor’ from London to Dover to enable vehicles to com