Skip to main content

£495 million National Highways specialist contract

A £495 million National Highways specialist engineering advice contract has been awarded.
By MJ Woof July 1, 2025 Read time: 2 mins
M42: A new stretch of dual carriageway in the UK is now open and will cut journey times for drivers


A £495 million contract has been awarded by National Highways to AtkinsRéalis Jacobs Joint Venture, Ove Arup & Partners, Amey, Arcadis, Costain, and WSP in collaboration with Mott MacDonald. This for a new Specialist Professional and Technical Services Framework (SPaTS3) contract. The firms will have been selected by National Highways for the SPaTS3, technical engineering advice framework.

This advisory and engineering role is intended to help the highways network drive economic growth, improve safety and reliability, and further the UK’s decarbonisation goals. This builds on the foundations laid under the SPaTS2 framework, which Costain was previously selected for. The SPaTS3 Framework has an estimated maximum value of up to £495 million to the six suppliers over its six-year term and will cover the whole of Roads Investment Strategy 3. 

The services under the framework will encompass geotechnical engineering, asset operation, maintenance, assurance, performance, design standards manuals and departures, environmental, highways structures, sustainability, and transport engineering services.

The previous framework, SPaTS2, facilitated specialist advice and support through the Second Road Investment Strategy.

Meanwhile, a new stretch of dual carriageway in the UK will improve journey times for drivers. The A4545 dual carriageway links the newly built junction 5a on the M42 with Clock Interchange roundabout – providing people with direct access from the M42 to Birmingham Business Park, Birmingham Airport and the A45 to Birmingham, whilst also acting as an alternative route into the National Exhibition Centre.

The 2.4km stretch initially opened with one lane running in both directions at the end of last year but now permanent traffic management has been removed, and the road is fully up and running helping to relieve traffic congestion at junction 6 and poor journey reliability in the area.

With work due to complete on the M42 Junction 6 scheme this winter, National Highways has revealed that by combining works along the corridor it has been able to avoid 8,892 hours of closures, saving the taxpayer over £650,000 and preventing 1,072tonnes of carbon emissions.

So far, HS2 works, utility company work and National Highways maintenance and survey schemes have been completed during the M42 closures and project teams working in the area continue to identify opportunities to reduce disruption and save money.

For more information on companies in this article

Related Content

  • UK road maintenance contract awarded for Wiltshire
    December 9, 2022
    A UK road maintenance contract has been awarded for Wiltshire.
  • Balfour included on major UK Highways Agency framework contract
    November 7, 2014
    Balfour wins place on major UK Highways Agency road framework contract Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion). Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Del
  • Nepal tunnel project tender
    June 10, 2021
    The tender process is opening for a tunnel project in Nepal.
  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.