Skip to main content

£20 million road resurfacing package

A £20 million road resurfacing package for Aggregate Industries
By MJ Woof January 16, 2025 Read time: 2 mins
Aggregate Industries will resurface and maintain roads in Leicester for the next two years

 

Aggregate Industries has won a £20 million contract to resurface and maintain Leicester’s roads for the next two years. 

Aggregate Industries has its group headquarters near Coalville in Leicestershire where it also operates its Bardon Hill Quarry and asphalt plants. This latest contract builds on the company’s proven success during a four-year contract with Leicester City Council, during which it delivered major road improvements and maintenance schemes across the city.

The business has previously held the contract for Leicester City Council’s carriageways between 2020 and 2024 and this latest contract will run for a period of a further two years, with an option of two extensions of 12 months each. 

Kevin Murgatroyd, Managing Director for Aggregate Industries’ Contracting division said: “We’re thrilled to be part of this ongoing project in our hometown of Leicester. Securing this contract is a great win for our team and showcases our proven track record in working for Leicester City Council”. 

Martin Fletcher, City Highways Director expressed his confidence in Aggregate Industries’ work: “After a robust procurement process, Leicestershire based supplier Aggregate Industries UK has secured a two-year contract with the city council. The company has a strong history of delivering road maintenance schemes in the region, including Leicester. We look forward to continuing our collaboration to enhance the safety, quality and longevity of Leicester’s roads for both residents and visitors alike”.

 

For more information on companies in this article

Related Content

  • Asphalt plans silos increase efficiency, reduce waste
    May 8, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    March 21, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment. Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • New Bangladesh expressway section to be built
    January 27, 2022
    A new Bangladesh expressway section is to be built in capital Dhaka.
  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a