Skip to main content

Progress on Balkan motorway

The Bosnia and Herzegovina Government says 60% of works have been completed on the Corridor V-c motorway between Drivusa and Kakanj. The €43.20million (US$56.28million) project, agreed in April 2010 between the Government's roads directorate and joint venture firm Viadukt d.d-Hering, will see the motorway created from three sub-roads between Drivusa-Gorica, Gorica-Biljesevo and Biljesevo-Kakanj.
April 24, 2012 Read time: 1 min
The Bosnia and Herzegovina Government says 60% of works have been completed on the Corridor V-c motorway between Drivusa and Kakanj. The €43.20million (US$56.28million) project, agreed in April 2010 between the Government's roads directorate and joint venture firm Viadukt d.d-Hering, will see the motorway created from three sub-roads between Drivusa-Gorica, Gorica-Biljesevo and Biljesevo-Kakanj.

Related Content

  • IDB, iRAP extend Latin America-Caribbean work
    February 25, 2025
    The five-year deal was signed during the Ten Steps to 2030 for Safer Road Infrastructure Side Event at the recent 4th Global Ministerial Conference on Road Safety underway in Marrakech, Morrocco.
  • Highway developments in India
    February 23, 2012
    A major highway deal has been agreed for a road project in Gujarat, India, worth an estimated US$810.8 million. It will be handled under the build, finance, operate and transfer basis and will involve upgrading and widening to six lanes a 102km section of National Highway 8 (NH-8) from Ahmedabad-Vadodara. The project also includes upgrading 92km of the existing Ahmedabad-Vadodara expressway. Work is expected to take three years to complete, and the 25-year concession deal for the project has been agreed bet
  • Highway developments in India
    April 10, 2012
    A major highway deal has been agreed for a road project in Gujarat, India, worth an estimated US$810.8 million. It will be handled under the build, finance, operate and transfer basis and will involve upgrading and widening to six lanes a 102km section of National Highway 8 (NH-8) from Ahmedabad-Vadodara. The project also includes upgrading 92km of the existing Ahmedabad-Vadodara expressway. Work is expected to take three years to complete, and the 25-year concession deal for the project has been a
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.