Skip to main content

Progress on Balkan motorway

The Bosnia and Herzegovina Government says 60% of works have been completed on the Corridor V-c motorway between Drivusa and Kakanj. The €43.20million (US$56.28million) project, agreed in April 2010 between the Government's roads directorate and joint venture firm Viadukt d.d-Hering, will see the motorway created from three sub-roads between Drivusa-Gorica, Gorica-Biljesevo and Biljesevo-Kakanj.
April 24, 2012 Read time: 1 min
The Bosnia and Herzegovina Government says 60% of works have been completed on the Corridor V-c motorway between Drivusa and Kakanj. The €43.20million (US$56.28million) project, agreed in April 2010 between the Government's roads directorate and joint venture firm Viadukt d.d-Hering, will see the motorway created from three sub-roads between Drivusa-Gorica, Gorica-Biljesevo and Biljesevo-Kakanj.

Related Content

  • Ring road for Sarajevo nears completion
    December 17, 2012
    The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag. The completed Ring Road will be part of the future Corridor Vc motorway. Bosnia and Herzegovina Federal Minister of Transport and Telecoms, Enver Bijedic, and State Minister of Telecoms and Transport and Director of the roads company JP Ceste FBiH, Filip Vujevo, r
  • Bosnia Herzegovina road and tunnel works underway
    March 3, 2022
    Road and tunnel works are underway in Bosnia Herzegovina.
  • Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway
    October 20, 2017
    Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
  • Sarajevo Ring Road works set to finish in October 2012
    July 27, 2012
    The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag AG. The completed Ring Road will be part of the future Corridor Vc motorway.