Skip to main content

Progress on Balkan motorway

The Bosnia and Herzegovina Government says 60% of works have been completed on the Corridor V-c motorway between Drivusa and Kakanj. The €43.20million (US$56.28million) project, agreed in April 2010 between the Government's roads directorate and joint venture firm Viadukt d.d-Hering, will see the motorway created from three sub-roads between Drivusa-Gorica, Gorica-Biljesevo and Biljesevo-Kakanj.
April 24, 2012 Read time: 1 min
The Bosnia and Herzegovina Government says 60% of works have been completed on the Corridor V-c motorway between Drivusa and Kakanj. The €43.20million (US$56.28million) project, agreed in April 2010 between the Government's roads directorate and joint venture firm Viadukt d.d-Hering, will see the motorway created from three sub-roads between Drivusa-Gorica, Gorica-Biljesevo and Biljesevo-Kakanj.

Related Content

  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • Construction delays affect Bosnian highway project
    May 10, 2012
    In Bosnia, delays have affected the construction work on the country’s key Corridor 5c highway project. So far 37km of the 336km Corridor 5c highway has been built, with 21km under construction and a further 43km section being cleared for work to commence. Construction work on a section of the Corridor 5c highway is set to commence by the end of September 2011. The section of highway being built is located in Ljubuska and Capljina, with work staring on the 4km Kravica-Bijaca and due for completion in 10 mon
  • Kosovan highway ahead of schedule
    April 25, 2012
    In Kosovo, work is pushing ahead of schedule on the Route 7 highway to link capital Pristina with the Albanian border. Sections of the 120km highway have been opened, one year ahead of schedule. An official opening of several sections of the highway has been carried out by Kosovan leaders, including Prime Minister Hashim Thaçi, President Atifete Jahjaga, and members of Parliament, along with Albanian Prime Minister Sali Berisha and US representatives Eliot Engel (D- NY) and Gary Peters (D-MI) joined thousan
  • German highway project awarded
    January 25, 2021
    A key German highway project has been awarded.