Skip to main content

Probolinggo-Banyuwangi section opens

Main construction of the 11.2km-long section on Indonesia’s island of Java has been completed with road markings, signs and street lighting, along with the toll gate at Paiton.
By David Arminas April 3, 2025 Read time: 2 mins
The Probolinggo–Banyuwangi Toll Road in East Java is the final phase of Trans-Java Toll Road with the port of Merak on the western end (image © Tarasari/Dreamstime)

The Kraksaan-Paiton section of the Probolinggo-Banyuwangi Highway on the island of Java is now open but with limited travel, according to Indonesian media reports.

Main construction of the 11.2km-long section has been completed with road markings, signs, barriers, guardrails and public street lighting, along with the toll gate at the town of Paiton.

The highway has been operating as a one-way system during the Eid holiday period, the end of the holy month of Ramadan, with traffic flowing from Kraksaan to Paiton for some time and then from Paiton to Kraksaan.

The four-lane road has a 100kph speed limit and will connect to the 13km Gending-Kraksaan toll road section. This national strategic project is managed by PT JPB, with majority ownership by PT Jasa Marga (Persero) Tbk at 96.33%. It is being constructed by a consortium of HKI, PT Acset Indonusa Tbk. (ACST) and PT Nindya Karya (NK).

The Probolinggo–Banyuwangi Toll Road in East Java will run from the Probolinggo Regency (region) eastward through the Situbondo Regency and end in the Banyuwangi Regency. The toll road will be integrated with Banyuwangi’ port of Ketapang to allow crossing from the island of Java to Bali. The toll road is the final phase of Trans-Java Toll Road with the port of Merak on the western end.

Related Content

  • New tolled highway plans for Indonesia
    November 1, 2012
    The authorities in Indonesia have set out extensive plans to source funding for new tolled highways. In all seven highway projects have been identified as crucial to expanding the network and improving connectivity for the Indonesian islands of Sulawesi, Java and Sumatra. Some US$25 billion in loans from overseas has been sourced by the Public Works Ministry of Indonesia.
  • Indonesia’s key highway project
    January 27, 2022
    Indonesia’s key highway project is well underway.
  • Indonesia: Jasa Marga secures four highway concession deals
    June 8, 2016
    Toll road operator Jasa Marga of Indonesia has added four contracts at a cost of nearly US$2.4 billion to its highway concession portfolio. Jasa Marga hold equity of between 55% and 65% in each project, according to a report by the Jakarta Post newspaper. The contracts are for the 40km Bitung-Manado Highway in Sulawesi, the 99km Samarinda-Balikpapan Highway in Kalimantan, the 38km Malang-Pandaan Highway in East Java and the 75km Semarang-Batang Highway in central Java. Netherlands-based Indonesia I
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.