Skip to main content

Probolinggo-Banyuwangi section opens

Main construction of the 11.2km-long section on Indonesia’s island of Java has been completed with road markings, signs and street lighting, along with the toll gate at Paiton.
By David Arminas April 3, 2025 Read time: 2 mins
The Probolinggo–Banyuwangi Toll Road in East Java is the final phase of Trans-Java Toll Road with the port of Merak on the western end (image © Tarasari/Dreamstime)

The Kraksaan-Paiton section of the Probolinggo-Banyuwangi Highway on the island of Java is now open but with limited travel, according to Indonesian media reports.

Main construction of the 11.2km-long section has been completed with road markings, signs, barriers, guardrails and public street lighting, along with the toll gate at the town of Paiton.

The highway has been operating as a one-way system during the Eid holiday period, the end of the holy month of Ramadan, with traffic flowing from Kraksaan to Paiton for some time and then from Paiton to Kraksaan.

The four-lane road has a 100kph speed limit and will connect to the 13km Gending-Kraksaan toll road section. This national strategic project is managed by PT JPB, with majority ownership by PT Jasa Marga (Persero) Tbk at 96.33%. It is being constructed by a consortium of HKI, PT Acset Indonusa Tbk. (ACST) and PT Nindya Karya (NK).

The Probolinggo–Banyuwangi Toll Road in East Java will run from the Probolinggo Regency (region) eastward through the Situbondo Regency and end in the Banyuwangi Regency. The toll road will be integrated with Banyuwangi’ port of Ketapang to allow crossing from the island of Java to Bali. The toll road is the final phase of Trans-Java Toll Road with the port of Merak on the western end.

Related Content

  • Lindsay argues the case for reversible lanes over adding lanes
    June 26, 2018
    Build new lanes or use existing lanes more effectively? In a recent US study* commissioned by Lindsay Transportation Solutions, the company argues the case for reversible lanes. The level of future uncertainty in transportation planning - specifically in addressing congestion on urban freeways - has increased significantly over the past few years. The impact of connected and autonomous vehicles on traffic flow, of Mobility as a Service (MaaS) initiatives, particularly the car-sharing elements, and exciting
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • Zaxis-5s biggest-ever project
    January 27, 2014
    Norwegian contractor Carl C Fon has secured its largest-ever road construction contract to complete a 4.6km section of the E18 in the Mysen region of its home country. It started the €25million project in August 2012 and it is scheduled for completion in the summer of 2014.
  • Kenya construction contract cancelled
    January 21, 2025
    Kenya has cancelled a consortium’s key construction contract.