Skip to main content

Probolinggo-Banyuwangi section opens

Main construction of the 11.2km-long section on Indonesia’s island of Java has been completed with road markings, signs and street lighting, along with the toll gate at Paiton.
By David Arminas April 3, 2025 Read time: 2 mins
The Probolinggo–Banyuwangi Toll Road in East Java is the final phase of Trans-Java Toll Road with the port of Merak on the western end (image © Tarasari/Dreamstime)

The Kraksaan-Paiton section of the Probolinggo-Banyuwangi Highway on the island of Java is now open but with limited travel, according to Indonesian media reports.

Main construction of the 11.2km-long section has been completed with road markings, signs, barriers, guardrails and public street lighting, along with the toll gate at the town of Paiton.

The highway has been operating as a one-way system during the Eid holiday period, the end of the holy month of Ramadan, with traffic flowing from Kraksaan to Paiton for some time and then from Paiton to Kraksaan.

The four-lane road has a 100kph speed limit and will connect to the 13km Gending-Kraksaan toll road section. This national strategic project is managed by PT JPB, with majority ownership by PT Jasa Marga (Persero) Tbk at 96.33%. It is being constructed by a consortium of HKI, PT Acset Indonusa Tbk. (ACST) and PT Nindya Karya (NK).

The Probolinggo–Banyuwangi Toll Road in East Java will run from the Probolinggo Regency (region) eastward through the Situbondo Regency and end in the Banyuwangi Regency. The toll road will be integrated with Banyuwangi’ port of Ketapang to allow crossing from the island of Java to Bali. The toll road is the final phase of Trans-Java Toll Road with the port of Merak on the western end.

Related Content

  • Major Indonesian highway projects moving ahead
    December 13, 2018
    A series of major highway projects are now moving ahead in Indonesia. One of the projects is for part of the Trans-Java Toll Road. Work is now starting to build the route and this new 759km toll road will connect Surabaya and Jakarta. Construction is already underway on building the Bogor-Ciawi-Sukabumi Toll Road or Bocimi linking West Java's Ciawi with Cigombong.
  • Trans-Sumatra costs reach $1.7 billion, according to Hutama Karya
    November 14, 2016
    The cost for completing the three toll road sections of the Trans-Sumatra project will be almost US$1.7 billion, according to a major Indonesian construction firm. Hutama Karya is working on the 140km stretch from Bakauheni-Terbangi Besar, the 28km Palembang-Simpang Indralya section and the 18km Medan-Binjai stretch, said the company’s managing director, Gusti Ngurah Putera The Trans-Sumatran Highway is the primary north-south road, running around 2,500km on the island of Sumatra. It connect the north
  • Indonesia focusing on strategic toll road construction
    November 4, 2020
    Indonesia is focusing on developing strategic toll road construction projects.
  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.