Skip to main content

Probolinggo-Banyuwangi section opens

Main construction of the 11.2km-long section on Indonesia’s island of Java has been completed with road markings, signs and street lighting, along with the toll gate at Paiton.
By David Arminas April 3, 2025 Read time: 2 mins
The Probolinggo–Banyuwangi Toll Road in East Java is the final phase of Trans-Java Toll Road with the port of Merak on the western end (image © Tarasari/Dreamstime)

The Kraksaan-Paiton section of the Probolinggo-Banyuwangi Highway on the island of Java is now open but with limited travel, according to Indonesian media reports.

Main construction of the 11.2km-long section has been completed with road markings, signs, barriers, guardrails and public street lighting, along with the toll gate at the town of Paiton.

The highway has been operating as a one-way system during the Eid holiday period, the end of the holy month of Ramadan, with traffic flowing from Kraksaan to Paiton for some time and then from Paiton to Kraksaan.

The four-lane road has a 100kph speed limit and will connect to the 13km Gending-Kraksaan toll road section. This national strategic project is managed by PT JPB, with majority ownership by PT Jasa Marga (Persero) Tbk at 96.33%. It is being constructed by a consortium of HKI, PT Acset Indonusa Tbk. (ACST) and PT Nindya Karya (NK).

The Probolinggo–Banyuwangi Toll Road in East Java will run from the Probolinggo Regency (region) eastward through the Situbondo Regency and end in the Banyuwangi Regency. The toll road will be integrated with Banyuwangi’ port of Ketapang to allow crossing from the island of Java to Bali. The toll road is the final phase of Trans-Java Toll Road with the port of Merak on the western end.

Related Content

  • Algeria developing its Sahara route
    June 2, 2021
    Algeria is developing its section of the Trans-Sahara route.
  • Jakarta Airport taxiway upgrade
    June 7, 2019
    Equipment from German firm Bauer has been used to help upgrade facilities at Jakarta Airport in Indonesia. The Soekarno-Hatta International Airport is located in Cengkareng, Banten, a suburb of the Indonesia’s capital city, Jakarta, is one of the largest airports in Asia. Handling around 63 million passengers in 2017 and over 447,000 flight movements/year, the aircraft handling facilities were becoming too crowded. The answer was to construct a new connecting taxiway linking the existing runways at the eas
  • Indonesian toll road project tender
    June 9, 2021
    A major Indonesian toll road project tender is opening.
  • Indonesia reaches out to private firms for projects in Madura
    August 11, 2017
    The Indonesian government is courting private investment and encouraging bids for major projects on Madura, an island off the northeastern coast of Java, another island. Madura is part of the East Java province and is separated from Java by the narrow Strait of Madura. The first project would be a 15.3km toll bridge costing likely around US$160 million which would allow access to a planned port, said Herman Hidayat, acting head of the Surabaya-Madura Development Agency.