Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Massey Bridge concession popular
    October 10, 2016
    The concession package for the Massey Bridge in Canada is proving popular, with several firms keen to win the deal. Three consortia are in the running for the bridge project, which is intended to replace the existing George Massey Tunnel.
  • Strabag wins Polish A1 motorway deal for Wozniki-to-Pyrzowice section
    September 2, 2015
    Strabag consortium has signed a contract for construction of a 15.2km section of the A1 motorway between Wozniki and Pyrzowice. Completion of the section that will connect Pyrzowice with Czestochowa is due by the end of 2018. It is the first of four contracts signed for construction of the motorway. Strabag’s offer is believed to be around €144 million, while the budget set by the General Directorate for National Roads and Motorways (GDDKiA), was set just over €200 million. Meanwhile, the S6 dual car
  • Ustronie Morskie junction to the ring-road of Koszalin
    November 3, 2015
    Strabag consortium has signed a contract with the Polish General Directorate for National Roads and Motorways (GDDKiA) for construction of an S6 dual carriageway section. The work, worth around US$113 million, is due for completion in April 2019. It also makes Strabag responsible for more than 100km of S6 work. The latest section is from the Ustronie Morskie junction to the ring-road of Koszalin and Sianow. Before the entire S6 route is completed, a contract for Kolobrzeg-Ustronie Morskie section m
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for