Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • bauma Africa expanded to 50,000m2
    April 11, 2013
    Demand for exhibition space at the inaugural bauma Africa has meant the event has again been expanded. Instead of the originally planned 200 exhibitors, the premiere of bauma Africa in Johannesburg, South Africa from 18-21 September, is now expecting to host around 400 exhibitors. The resulting increase in demand for exhibition space means the event being expanded again, by another 15,000m2 to a total of 50,000m2. Organisers Messe München International says that major players including Atlas Copco, Bauer,
  • Major road deals for France
    May 3, 2012
    The tender process for the A355 western Strasbourg bypass in France is nearing completion and the winner will be announced shortly. The 24km highway stretch is expected to take 52 months to build and will cost some €750 million while for the moment at least, Vinci Concessions is the preferred bidder. The 55 year contract includes design, financing, construction and operation and maintenance.
  • Major road deals for France
    March 20, 2012
    The tender process for the A355 western Strasbourg bypass in France is nearing completion and the winner will be announced shortly. The 24km highway stretch is expected to take 52 months to build and will cost some €750 million while for the moment at least, Vinci Concessions is the preferred bidder. The 55 year contract includes design, financing, construction and operation and maintenance.
  • New South Africa bridge project for STRABAG
    September 6, 2017
    Contractor STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project