Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Strabag thinks positive despite drop in half year group revenue
    September 2, 2016
    Publicly listed construction company Strabag reports “a very positive development” in the first six months of 2016, despite lower group revenue. Consolidated group revenue fell back 8% to €5,312.15 million.
  • Mexico: OHL to bid for La Raza-Indios Verdes-Santa Clara contract
    June 22, 2015
    OHL Mexico, a subsidiary of Spanish construction firm OHL, has confirmed it will bid for the construction and operation contract for Mexico’s La Raza-Indios Verdes-Santa Clara motorway. The 9.5km road worth around US$364 million will be let as a public-private partnership under the federal government’s National Infrastructure Programme, Mexico’s El Economista newspaper reported. A total of 14 companies are interested in the project, including Pinfra, Ideal, Prodemex, China Harbour Engineering Mexico
  • Italian project under question
    March 15, 2012
    A fresh set of problems has hit the long planned Messina Straits Bridge in Italy. There is now reduced funding available for the project from the Italian Government.
  • Chile’s Chacao bridge project generates just one consortium technical bid
    November 8, 2013
    Only one consortium has submitted a technical bid in the tender for a project to build the Chacao bridge in Chile. The bridge will link Chiloe island with Chile’s mainland Los Lagos region. The Chilean government has earmarked a maximum project budget of US$740 million. The consortium that has submitted the technical bid, which would see the construction of a four-lane bridge, is made up of Hyundai of South Korea, Systra of France, Brazilian company OAS and Aas-Jakobsen of Norway. The consortium has