Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Terex Trucks in Oman quarry
    October 26, 2016
    Two Terex Trucks TR60 rigid dump trucks are proving their versatility at an Oman Cement Company (OCC) quarry in Muscat OCC operates a quarry near the capital Muscat and issued a tender for two dump trucks. Oman trading company Al Fairuz submitted a bid on behalf of Terex Trucks. And after visiting the job site, the team from Al Fairuz realised that the 55tonne capacity TR60 was well suited to the task at hand. Although the Terex Trucks brand is comparatively new to Oman, Al Fairuz was sure it could wi
  • US$176.6 million Oman expressway underway
    August 12, 2024
    Construction of a US$176.6 million Oman expressway project is underway.
  • Strabag to build 24km section of Poland’s S6 for €83 million
    November 2, 2015
    Publically listed Strabag has won the design and build contract to build a 24km section of Poland’s S6 for €83 million. The S6 expressway links the largest cities in northern Poland, Szczecin and Gdańsk. The publicly listed construction group Strabag will design and build the section between Goleniów and Koszalin for about €83 million. Construction of the 24 km dual carriageway asphalt road with two lanes of traffic in each direction will start this month with a scheduled finish of June 2019. The cont
  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea