The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length 
      
  
           
                          
                June 13, 2013
              
            
                          
                Read time: 2 mins
              
                    
                The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.
 
Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.
 
The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be3086   Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709   STFA of Turkey, CCC, 2379   Ghantoot Transport of the UAE, NUEC, 3340   Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945   Strabag Oman, 4921   TOTO, 5739   Hyundai Engineering & Construction of South Korea, 5544   Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148   Mapa GUNA, 980   OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149   Impregilo of Italy, Ozkar Construction of Turkey, 5177   Vinci of France, Wade Adams of the UAE, 4138   Bechtel, Impresa of Italy and Cyfield
      
    Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.
The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be
 
     
        


