Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.
  • Istanbul to get new underwater tunnel by 2015
    November 8, 2013
    A new underwater tunnel being created in Istanbul, Turkey will dramatically reduce journey times between two sides of the mega city. The €957.34 million Avrasya Tunnel (Eurasia Tunnel) will connect Kazlicesme on the European side to Goztepe in the Anatolian side via a 15 minute car journey which currently takes around 100 minutes. Situated around 106 metres underwater, the Avrasya Tunnel will be the world's sixth biggest tunnel. It will be based on two storeys of two lanes each, and will be used by aroun
  • Poland’s planned programme of highway construction
    December 13, 2013
    Poland’s National Road Construction Programme has been amended for the 2011-15 period. One of the new projects being handled is for the southern section of the ring-road (POW) for capital Warsaw will benefit. The tender process is opening for the construction of an 18.5km section of the S2 dual carriageway from Pulawska junction to Lubelska junction. The General Direction of National Roads and Motorways (GDDKiA) is keen for the southern Warsaw ring road to be open to traffic by 2019. The Pulawska-Lubleska s
  • New highway for Nepal
    February 28, 2012
    Construction is underway on Nepal's new Kaligandaki highway, which will provide a key route running North-South through the country.