Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Brazilian bridge and highway project tenders
    April 7, 2014
    A series of major project tenders are opening in Brazil. The Brazilian Government has announced five new road tenders to be launched in 2014. The highway sections run for a total distance of some 2,625km. This programme of works will lengthen the country’s highway network by some 2,282km, with the work costing an impressive US$7.39 billion in all.
  • UAE mountain road construction complete
    January 5, 2017
    An eight year project to construct the highest road in the UAE is now complete, with key help having been provided by a fleet of Volvo CE machines The work was carried out by local contractor General Mechanic Company (GMC), with assistance from Volvo CE dealer FAMCO as well as Volvo CE itself and Volvo Trucks. The 36km road climbs 1,910m to its highest point in a mountain range and required the transportation of 5.5 million m3 of materials during its construction.
  • Black sea countries complete preparations for implementation of Black Sea Ring project
    August 23, 2016
    The Black Sea Ring Road project will improve transport connections for the region - Eugene Gerden writes. Russia has officially started implementation of a project, known as the Black Sea Ring Road, which involves building a four-lane highway system connecting the countries surrounding the Black Sea. The Black Sea Ring Road is a substantial project, a highway measuring some 7,140km in all. Among the countries participating in the project are Turkey, Georgia, Russia, Ukraine, Moldova, Romania, Greece and
  • Louis Berger wins key India bridge deal
    January 10, 2018
    Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish