Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Congestion and safety concerns over Serbia’s roads
    February 23, 2012
    With traffic flows on the increase, Serbia needs to improve its road network and safety record, reports Gordon Feller. Serbia's road network needs to upgrade its road system against the backdrop of increased traffic flows. Serbia is crossed by segments of the important Trans European network (TEN). Corridor X with its branches Xb (Belgrade-Budapest) Xc (Nis-Sofia), and Xd (Nis-Presevo), represent the most important transit routes in the Republic, connecting Austria/Hungary, Slovenia/Croatia, and Bulgaria/Ma
  • Contract costs in the frame
    March 2, 2012
    The construction costs of the new Mafraq-Ghweifat in Abu Dhabi have been thrown into the spotlight.
  • Kellands and Northern Excavators mark 25 years as Doosan dealers
    January 3, 2013
    Doosan dealers, Kellands (Plant Sales) Ltd and Northern Excavators Ltd, are both celebrating their 25th anniversaries this year as dealers for the Doosan Heavy range of equipment from Doosan Infracore Construction Equipment (DICE). Kevin Zimmer, DICE regional director for UK and Ireland, said: “The Doosan family is proud of the partnership developed over the past 25 years with Kellands and Northern Excavators. Achieving such a milestone is a testament to the focus at both dealers on delivering an exceptiona
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.