Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
  • Bullish IronPlanet predicts strong sales for 2015
    February 19, 2015
    Auction operation IronPlanet says that 2014 has proved to be a strong year for its business development. The company has grown significantly since it began as an idea in a Harvard Business School working group, which suggested an online auction business to buy and sell machines. And six years from its move to expand into EMEA, the company says it has sold over US$ 3 billion worth of used equipment worldwide.
  • Bullish IronPlanet predicts strong sales for 2015
    January 6, 2017
    Auction operation IronPlanet says that 2014 has proved to be a strong year for its business development. The company has grown significantly since it began as an idea in a Harvard Business School working group, which suggested an online auction business to buy and sell machines. And six years from its move to expand into EMEA, the company says it has sold over US$ 3 billion worth of used equipment worldwide.
  • STRABAG reports strong financial performance
    November 30, 2015
    Contractor STRABAG is bullish and report strong economic performance for its latest financial results. The firm’s output volume after first nine months of 2015 hit nearly €10.3 billion, an increase of 6% over the same period for 2.14. Meanwhile there was strong growth in earnings with the firm’s EBITDA rising to €403.79 million, and EBIT to €115.81 million. The order backlog was down 11% to €13.8 billion however. For the whole of 2015, the outlook is healthy.