Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • STRABAG wins Austria highway widening deal
    October 6, 2016
    STRABAG will handle the contract to widen Austria’s A1 highway in Austria between Matzleinsdorf and Pöchlarn. The €22 million contract involves widening to three lanes and has a scheduled completion date of May 2018. The contract also includes widening eight bridges along the 5.1km section. Construction work is now underway on the project.
  • China Railway Construction wins US$2.68bn Chinese highway tenders
    January 23, 2013
    China Railway Construction has won tenders worth US$2.68 billion (CNY 16.67bn) to develop Chinese highways. The projects will be implemented on a build-operate-transfer (BOT) model. These are said to be inclusive of the 63.47km Liaocheng-Xiajin section of the Shandong Deshang highway, the 72.41km Yutai-Jining section of the Xuzhou-Jinan highway, and the 82.79km Xing'an-Ziyuan highway.
  • Strabag chief executive promises response to tougher trading conditions
    August 31, 2012
    Strabag chief executive, Hans Peter Haselsteiner, has spoken of the need for the Group to respond to tougher future trading conditions after its half year 2012 earnings fell, as expected, substantially from 2011 levels. New figures published by the Austrian construction giants revealed that its EBITDA was € 16.14 million between
  • Strong performance for upcoming bauma China event
    December 14, 2012
    The organisers of bauma China have every right to feel pleased with their work - Mike Woof reports As the bauma China 2012 exhibition closed its doors, the organisers were likely congratulating themselves over a highly successful event. Anyone walking the aisles at this exhibition cannot fail to have noticed the huge numbers of visitors, with early figures saying that 180,000 people visited the show. This was a notable 16% increase over the 155,615 visiting this exhibition in 2010. Despite the slowdown in t