Skip to main content

Portuguese toll plan makes strong start

Around 72,500 foreign drivers have already registered for the electronic toll payment system set up at motorways which connect to the Spanish border, according to Portuguese road agency (Estradas de Portugal-EP). Implemented on 1 July, 2012, the ‘Easy Toll’ system is a pre requirement to drive on SCUT motorways. Within the overall registration total, 30,961 have registered for the ‘Easy Toll’ on the A25 motorway, connecting Aveiro and Vila Formoso. Using a banking payment card, drivers can associate the cha
December 17, 2012 Read time: 1 min
Around 72,500 foreign drivers have already registered for the electronic toll payment system set up at motorways which connect to the Spanish border, according to Portuguese road agency (1410 Estradas de Portugal-EP).

Implemented on 1 July, 2012, the ‘Easy Toll’ system is a pre requirement to drive on SCUT motorways. Within the overall registration total, 30,961 have registered for the ‘Easy Toll’ on the A25 motorway, connecting Aveiro and Vila Formoso. Using a banking payment card, drivers can associate the charging system to the number plate of their vehicles. The operation is valid for one month and every time the car passes through a booth the fee is debited from the driver’s bank account.

Drivers can also buy the Toll Card which is pre-loaded with up to €40, but they need to activate and associate the card with their vehicle's number plate.

For more information on companies in this article

Related Content

  • Portugal plans road repair programme
    December 15, 2014
    Portugal is planning a series of road repair and renovation works starting in 2015. The Portuguese road agency Estradas de Portugal (EP), plans to invest €436 million between 2015 and 2019. This will be invested in renovating the basic road infrastructure for local and regional routes. The plan calls for 250 bridges and viaducts to be upgraded, with 120 improvements on local roads. The programme of work also includes 100 sites where road safety will be improved.
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Marão road tunnel construction in Portugal back on track after 2-year halt
    January 22, 2014
    The construction of the Marão road tunnel in Portugal will be resumed in the first half of 2014 – ending a two-year suspension of works due to the financial constraints of the winning Somague-led build consortium. The concession for the tunnel, which, at 5.6km, will be Portugal’s longest road tunnel, is now under the control of the state road agency Estradas de Portugal. Another investment of €150 million (US$ 202.91 million) is required to complete the major infrastructure works, earmarked for completio
  • Marão road tunnel construction in Portugal back on track after 2-year halt
    January 22, 2014
    The construction of the Marão road tunnel in Portugal will be resumed in the first half of 2014 – ending a two-year suspension of works due to the financial constraints of the winning Somague-led build consortium.