Skip to main content

Portuguese toll plan makes strong start

Around 72,500 foreign drivers have already registered for the electronic toll payment system set up at motorways which connect to the Spanish border, according to Portuguese road agency (Estradas de Portugal-EP). Implemented on 1 July, 2012, the ‘Easy Toll’ system is a pre requirement to drive on SCUT motorways. Within the overall registration total, 30,961 have registered for the ‘Easy Toll’ on the A25 motorway, connecting Aveiro and Vila Formoso. Using a banking payment card, drivers can associate the cha
December 17, 2012 Read time: 1 min
Around 72,500 foreign drivers have already registered for the electronic toll payment system set up at motorways which connect to the Spanish border, according to Portuguese road agency (1410 Estradas de Portugal-EP).

Implemented on 1 July, 2012, the ‘Easy Toll’ system is a pre requirement to drive on SCUT motorways. Within the overall registration total, 30,961 have registered for the ‘Easy Toll’ on the A25 motorway, connecting Aveiro and Vila Formoso. Using a banking payment card, drivers can associate the charging system to the number plate of their vehicles. The operation is valid for one month and every time the car passes through a booth the fee is debited from the driver’s bank account.

Drivers can also buy the Toll Card which is pre-loaded with up to €40, but they need to activate and associate the card with their vehicle's number plate.

For more information on companies in this article

Related Content

  • Contractor Strabag reports strong performance
    April 30, 2013
    Austrian contractor STRABAG reports healthy earnings before interest and taxes (EBIT) of €207 million in 2012. This figure beats the firm’s own expectations and the expectations of the market. Net income after minorities stood at €61 million, showing an expected considerable decrease of 66.67% compared to the year before. “An output volume of €14 billion in 2012 – that’s nothing to complain about. With €13.2 billion, the end-of-the-year order backlog is also nearly exactly at the pre-crisis level of 2008, s
  • New Central Ring Road around Moscow to be built by 2018
    September 30, 2013
    Eugene Gerden evaluates Moscow’s new ring road mega project The Russian government plans to complete implementation of one of the most ambitious projects in the country’s road building industry in recent years, which involves construction of The Central Ring Road around Moscow by 2018. The new road should be built by the next presidential elections, while its length will be 339km. It is expected to be comprised of five sections and will be located 50km away from Moscow Ring Road, a ring road encircling the
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • Lower traffic emissions in London
    May 20, 2019
    London’s ultra-low emission zone (ULEZ) system is already proving successful. In the first month since the scheme was introduced, the number of non-compliant vehicles entering the charging zone has been reduced by 9,400/day, a drop of 26%. According to the latest research, 74% of vehicles entering the ULEZ have been in compliance with the emission requirements.