Skip to main content

Polish road in tender trouble

A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia. GDDKiA is reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDD
December 17, 2012 Read time: 1 min
A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of 3206 Hydrobudowa, 6461 SIAC Construction, 5279 PBG, and 6462 Aprivia. GDDKiA is reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDDKiA pays it €165.33 million (PLN 675mn). Earmarked to stretch 670km from the Polish-German border in Zgorzelec, through Wroclaw, Katowice, Kraków, Tarnów, and Rzeszów, to the Polish-Ukrainian border at Korczowa, the A4 is due for completion in 2013.

Related Content

  • Polish investment in road building to fall to $6.33bn in 2013
    March 4, 2013
    Road construction investment in Poland is expected to fall again in 2013 to US$ 6.33 billion (PLN 20bn), owing to contractual disputes in the sector, according to a study by market research firm PMR. This year’s predicted fall comes after investment plummeted 19% in 2012, the PRM study states. However, the road construction share of total construction activity has increased since Poland became a part of the European Union - reaching a 28% peak in 2011, and a 22% share last year. Last year, bankruptcies of a
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Polish highway connection to be completed
    January 25, 2017
    Poland is pushing ahead with plans to complete a section of the A1 highway. This stretch of the highway lies between Pyrzowice and Czestochowa in the south of the country. The work is expected to be funded to the tune of €315 million from the EU Cohesion Fund. This stretch of highway will play a key role in Poland’s future economic development when it opens to traffic in mid-2019. It will improve the transport connections with the important industrial city of Katowice in the south of the country and also wi