Skip to main content

Polish road in tender trouble

A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia. GDDKiA is reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDD
December 17, 2012 Read time: 1 min
A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of 3206 Hydrobudowa, 6461 SIAC Construction, 5279 PBG, and 6462 Aprivia. GDDKiA is reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDDKiA pays it €165.33 million (PLN 675mn). Earmarked to stretch 670km from the Polish-German border in Zgorzelec, through Wroclaw, Katowice, Kraków, Tarnów, and Rzeszów, to the Polish-Ukrainian border at Korczowa, the A4 is due for completion in 2013.

Related Content

  • Deals signed to construct Polish highway project
    August 22, 2017
    Construction of a stretch of the S7 dual carriageway in Poland will commence shortly following the signing of contracts for the work. The stretch, connecting Lotnisko junction with Grojec's ring road, will cost €186.66 million to build. Three contracts were awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA) for the work. Rubau Polska will build a 7km section while a 14.8km stretch will be built by IDS-Bud and Mota-Engil Central Europe will build an 8km portion of the link.
  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.
  • Polish road tender underway
    February 3, 2015
    Plans are underway for the Warsaw Ring Road project in Poland. Italian contractor Astaldi made the lowest offer for the project at €289.95 million. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete. There have been 10 bidders for the tender, being handled by the Polish road authority GDDKiA. Other bidders included the Porr Polska consortium and a construction consortium comprising contractors Budimex and Strabag.
  • Polish road works continue for STRABAG
    March 1, 2022
    Work on a Polish road project continues for STRABAG.