Skip to main content

Polish project tangle unravels?

The Polish General Directorate of National Roads and Motorways (GDDKiA) is not allowing Chinese firm COVEC to continue construction of A2 highway.
February 28, 2012 Read time: 1 min
The Polish General Directorate of National Roads and Motorways (1361 GDDKiA) is not allowing Chinese firm 2487 COVEC to continue construction of A2 highway. The deal suggested by COVEC would have required additional financing. Instead GDDKiA is looking to choose a different contractor either through a tender or negotiations with chosen companies. Time is an issue though given the need to finish the project before the 2012 football event so the project may be awarded to one of the firms that previously competed in the tender process and ran closest to COVEC's then winning bid. The decision by GDDKiA will become binding shortly. In the meantime the Chinese company can re-launch the construction works under the current contract. Apart from the €178 million penalty being imposed, GDDKiA wants COVEC to pay an additional statutory fine.

For more information on companies in this article

Related Content

  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • Global growth in machine rental
    May 20, 2015
    The machine rental sector is undergoing significant expansion worldwide – Dan Gilkes reports. Plant hire, equipment rental, leasing, call it what you will, being able to use a machine when and where you need it, with no further concerns relating to ownership costs, depreciation or sudden repair bills, remains a compelling argument for many contractors. Which is one of the main reasons for the continued growth in popularity of equipment rental across the world. Rental has been big business in the UK, the US
  • Rebuilding better gravel roads more efficiently
    October 15, 2015
    Using a linear road crusher can rebuild gravel roads using material onsite at a fraction of the cost of conventional methods. Gravel roads are common in many rural areas in the US to provide access to temporary work sites and are also used widely in developing countries. Maintaining and repairing these roads can pose challenges and new methods may offer improvements in efficiency.