Skip to main content

Polish project plan

The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project.
February 28, 2012 Read time: 2 mins
The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project. Speed is of the essence in this project given that a section of A2 highway between Lodz and capital Warsaw has to complete by 2012 in time for a major international football event. The key section in question is for a 20km stretch between the two cities. Up to 26 companies are said to be in the frame for the contract at present, including 3281 Eurovia, Polimex and 945 Strabag, as well as several other leading firms. Chinese contractor 2487 COVEC originally won the deal to build this section of highway but was forced to relinquish the deal following a series of delays and financial issues. The award of the contract to COVEC was controversial as the Chinese firm made a bid that was considerably lower than any of the other firms in the tendering process. Other contractors complained that they were not able to compete due to the exceptionally low bid by the Chinese firm. COVEC then tried to renegotiate its deal when it was hit with increasing costs of materials and other factors but this was declined by the Polish authorities. With time ticking away and the link still to be completed, the Polish authorities now face a major problem in finding a firm that can take over the project and finish the necessary work in time.

For more information on companies in this article

Related Content

  • Croatia rejects complaints over Peljeski Bridge tender
    April 6, 2018
    Croatia’s public procurement body has rejected complaints by all three international consortia over a winning low tender for the Peljeski bridge. Bids for construction of the four-lane 2.4km bridge were submitted in the middle of last year. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory. Croatia’s State Commission for Control of Public Ordering Processes
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Construction equipment market to grow - CEA report
    February 29, 2012
    The UK’s Construction Equipment Association attracted a large audience for its annual general meeting.
  • Pothole problems cause traffic delays
    April 21, 2023
    Pothole problems are a major cause of traffic delays and vehicle damage in many developed nations