Skip to main content

Polish project plan

The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project.
February 28, 2012 Read time: 2 mins
The authorities in Poland are looking for solutions to the debacle that has become the A2 highway project. Speed is of the essence in this project given that a section of A2 highway between Lodz and capital Warsaw has to complete by 2012 in time for a major international football event. The key section in question is for a 20km stretch between the two cities. Up to 26 companies are said to be in the frame for the contract at present, including 3281 Eurovia, Polimex and 945 Strabag, as well as several other leading firms. Chinese contractor 2487 COVEC originally won the deal to build this section of highway but was forced to relinquish the deal following a series of delays and financial issues. The award of the contract to COVEC was controversial as the Chinese firm made a bid that was considerably lower than any of the other firms in the tendering process. Other contractors complained that they were not able to compete due to the exceptionally low bid by the Chinese firm. COVEC then tried to renegotiate its deal when it was hit with increasing costs of materials and other factors but this was declined by the Polish authorities. With time ticking away and the link still to be completed, the Polish authorities now face a major problem in finding a firm that can take over the project and finish the necessary work in time.

For more information on companies in this article

Related Content

  • Polish dual carriageway contracts being agreed
    February 18, 2020
    Two important dual carriageway contracts are being agreed in Poland.
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • Delays for key Brazilian road projects
    March 3, 2016
    A series of major road projects in Brazil now look set to be delayed. Key road widening projects works awarded between 2012 and 2013 may now take longer than the original five year deadline to complete. Six road concession projects were awarded in the period, totalling over 3,000km of roads to be extended or upgraded. The contracts require that at least 10% of the planned work must be complete before any tolls can be charged. This initial phase has been carried out, but later stages to expand the roads have
  • STRABAG wins tricky Polish project
    May 2, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.